4
Fig.1:
Put the base cover C on the top of post A, then use bolt (AA) and wash (BB) to connect the base (B)
and post A.
Note: Make sure the slots on C and A are at the same side.
Fig.2:
Connect the beam F (D
)
and beam G
(
E
)
, by using the bolt (CC) and washer (BB).
Fig.3:
Attach the connected bar to stand post (A) by using bolt (CC) and washer (BB) then use bolt (AA) and
washer (BB) to fix the beam and post tightly.
Fig.4:
Fix the mosquito pipe P
(
O
)
onto the beam, use bolt (AA) and washer (BB).
AA
M6X15(Bolt)
12 PCS
BB
M6 (Washer)
16 PCS
DD
M6X35 (Bolt)
4 PCS
EE
M6 (Nut)
4 PCS
Hardware Used in Step 2
Fig.5, Fig.5-1:
Attach the connecting slice (H)
to the beam and post (A), by using bolt (AA)
and washer (BB).