background image

 

 

 

 

 

Panel A1 

 

Long beam1 

B1 2 

 

Long beam2 

C1 2 

 

Short beam1 

D1 2 

 

Short beam 2 

E1 2 

 

Second roof connector 

B2 2

 

Second roof connector 

A2 2 

 

Second roof slat   

C2 4 

 

Arc tube for the second 

roof 

E2 8 

 

Second roof canopy 

G2 1 

 

Top roof connector 

A3 1 

 

Top roof brace 

B3 4 

 

Top roof canopy 

C3 1 

 

Decorative top 

D3 2 

 

 

Mosquito net 

S3 1

 

 

Assemble assistant tool require: ladder and hammer are not included 

Checking List 

Summary of Contents for L-GZ120PST

Page 1: ... wind as possible damage will occur to the structure 5 Never barbecue under this gazebo or use lanterns that contain naked flames 6 This package contains small items and plastic bags that should be kept away from children 7 Ensure that all connectors poles are firmly secured in position fully It is important to do so before use so as to avoid collapsing or damage to the item which could result in ...

Page 2: ... 1 B2 2 Second roof connector 2 A2 2 Second roof slat C2 4 Arc tube for the second roof E2 8 Second roof canopy G2 1 Top roof connector A3 1 Top roof brace B3 4 Top roof canopy C3 1 Decorative top D3 2 Mosquito net S3 1 Assemble assistant tool require ladder and hammer are not included Checking List ...

Page 3: ... then tight those using Bolt BB and washer DD STEP1 16pieces AA M6 15mm screw 16pieces CC M6 washer 12pieces BB M5 15mm screw 12pieces DD M5 washer BB BB DD DD Connect B1 C1 D1 E1 and A1 with Bolt AA and washer CC 1 piece W2 M6 M5 Wrench BB DD 1 2 3 Connect B1 C1 D1 E1 and A1 with Bolt BB and washer DD 4 ...

Page 4: ...y BB DD to connect the C2 and D1 E1 or B1 and C1 Insert E2 into B2 Put the assembled top onto A1 insert E2 into A1 A2 B2 2 Fig3 Fig1 Fig2 Fig4 Fig5 the second roof canopy G2 C2 C2 Insert A2 into B2 and then tight those using Bolt BB and washer DD BB DD STEP2 8 pcs BB M5 15mm screw 8 pcs DD M5 washer Hardware Pack 2 ...

Page 5: ...Attach Decorative top D3 to the assembled top roof canopy C3 STEP3 Insert B3 into A3 D3 C3 Attach the top roof to the second roof insert B3 into B2 G2 C3 G2 C3 Knot the tie and the second roof canopy G2 ...

Page 6: ...Now your gazebo is ready for use STEP4 8 pcs GG stake 48 pcs HH Plastic ring for mosquito net 1 Use GG to fix the posts on the ground G S3 HH 2 Button the rings HH on S3 ...

Page 7: ...s have you do have the option of returning this item back to the store which you bought it from for an exchange of the same item or a refund of the purchase If you are within or beyond the return policy that most stores have and need tech assistance or replacement parts please call Sunjoy Industries at 1 866 578 6569 from 8 30 am to 5 30 pm eastern standard time or e mail to Biglots sunjoygroup co...

Reviews: