4
BB
M6 flat washer
TBZ10406HQ
20 PCS
CC
M6X15 bolt
TBZ00106015HQ
16 PCS
DD
M6X35 bolt
TBZ00306035HQ
4 PCS
EE
M6 nut
TBZ20106HQ
4 PCS
Hardware Pack 2
Fig.4:
Install Pothook (O) on Top connector (L). Insert Long slanting bar (I), Short top bar (J) and Long top
bar (K) into Top connector (L). (Here need one person support the Top connector L).
Fig.5:
Insert Long slanting bar (I) into Corner mandril connector E1 (E2).
Fig.6:
Insert Short top bar (J) into Short top bar connector (G). Insert Long top bar (K) into Long top bar
connector (F).
Fig.7:
Insert Small top pole (N) into Small top connector (M).
Fig.8:
Put Large canopy (X) on big top, do not spread. Install the assembled small top on Long slanting
bar (I) with bolt (DD), flat washer (BB) and nut (EE). Put the small canopy (W) on small top, and tighten it.
Fig.9:
Install Décor beam connector (H) on 4 corners of décor beam with bolt (CC), flat washer (BB).