M8X20MM bolt
TBZ00108020SS
AA
8 PCS
M8 flat washer
TBZ10808SS
BB
18PCS
M10 nut
TBZ20110SS
CC
4 PCS
M10 flat washer
TBZ10810SS
DD
4 PCS
M8 nut
TBZ20108SS
EE
10 PCS
M8 spring washer
TBZ10508SS
FF
14 PCS
M8/M10 wrench
Z
1 PC
Fig.1: Attach support beam (D) onto bridge
railings (A), then connect with flat washer
(BB), spring washer (FF) and nut (EE), but
do not tighten them at this step.
Hardware List