background image

 

M8X20MM bolt 

TBZ00108020SS 

AA 

8 PCS 

 

M8 flat washer 

TBZ10808SS 

BB 

18PCS 

 

M10 nut 

TBZ20110SS 

CC 

4 PCS 

 

M10 flat washer 

TBZ10810SS 

DD 

4 PCS 

 

M8 nut 

TBZ20108SS 

EE 

10 PCS 

 

M8 spring washer 

TBZ10508SS 

FF 

14 PCS 

 

M8/M10 wrench 

1 PC 

 

 

 

Fig.1:  Attach support  beam (D) onto bridge 

railings (A), then connect with flat washer 

(BB), spring washer (FF) and nut (EE),  but 

do not tighten them at this step. 

 

Hardware List 

Reviews: