5
KK
Bolt M5*15
4 pcs
LL
Flat Washer M5
4 pcs
BB
Flat Washer M6
10 pcs
JJ
Mosquito Netting Hook
Pre-assembled
112pcs
EE
Bolt M6X30
4 pcs
HH
Bolt M6*40
6 pcs
II
Nut M6
6 pcs
Hardware Pack 2
Fig.5: Attach Pole Support Slice (I) to Post (J) and Mosquito Netting Runner 1&2 (E1, E2, F1, F2) with
Bolt (AA) and Flat Washer (BB).
Fig.6: Attach Corner Support (H) to Long Mosquito Netting Runner 1&2 (E1&E2) and Short Mosquito
Netting Runner 1&2 (F1&F2) with Bolt (AA) and Flat Washer (BB).
Fig.7: Attach Beam connector (down) (S) to Short Mosquito Netting Runner 1&2(F1&F2) with Bolt AA
and Flat washer BB.
Fig.8: Attach Beam connector (down) (S) to Long Mosquito Netting Runner 1&2(E1&E2) with Bolt AA
and Flat washer BB.