background image

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hardware Pack 2 

No. 

Description 

Qty 

Image 

CC 

M6x35 Bolt 

8 PCS 

 

BB 

M6 Flat washer 

16 PCS 

 

DD 

M6 Nut   

8 PCS 

 

Fig.5 & Fig.5-1:

 Insert the oblique boards (G) to the big roof connection (K). Insert the tube under oblique boards (J) into the 

oblique boards (G). 

 

Fig.6: 

Screw the hook (M) to the big roof connection (K). 

Fig.7:

 Secure the tube under oblique boards (J) to the posts (A) using bolts (CC) and washers (BB). Tighten the connections 

and attach nut (DD) to the bolts (CC). 

Fig.8: 

Insert the long/short middle boards (H/I) into the big roof connection (K) 

Fig.9:

 Secure the middle boards (H and I) to the middle board connection (D) using bolts (CC) and flat washers (BB). 

Tighten securely and cover the bolts (CC) with nut (DD). Place the big canopy on top of the roof but do not unfold. 

Fig.10: 

Attach the small roof oblique boards (L) into the small roof connection (N). 

Fig.11: 

Attach the small canopy (P) along the small roof oblique board (L), aligning the corners and stretching it to fit. 

Reviews: