Hardware Pack 2
No.
Description
Qty
Image
CC
M6x35 Bolt
8 PCS
BB
M6 Flat washer
16 PCS
DD
M6 Nut
8 PCS
Fig.5 & Fig.5-1:
Insert the oblique boards (G) to the big roof connection (K). Insert the tube under oblique boards (J) into the
oblique boards (G).
Fig.6:
Screw the hook (M) to the big roof connection (K).
Fig.7:
Secure the tube under oblique boards (J) to the posts (A) using bolts (CC) and washers (BB). Tighten the connections
and attach nut (DD) to the bolts (CC).
Fig.8:
Insert the long/short middle boards (H/I) into the big roof connection (K)
Fig.9:
Secure the middle boards (H and I) to the middle board connection (D) using bolts (CC) and flat washers (BB).
Tighten securely and cover the bolts (CC) with nut (DD). Place the big canopy on top of the roof but do not unfold.
Fig.10:
Attach the small roof oblique boards (L) into the small roof connection (N).
Fig.11:
Attach the small canopy (P) along the small roof oblique board (L), aligning the corners and stretching it to fit.