Pro-Stage
Single-stage
Multi-stage
Time
Time: 10:30:55
YY/MM/DD
Date: 16/01/31
Setting confirmation
Countries Other
Pro-stage Single-stage
Grid codes MV
Date 2016/01/31
Confirm above settings?
kW
h
kW
h
15.6
497600
Run
kWh
kWh
kW
100.0%
P(%)
110
50
0
5
8 11 14
20
17
23
t
001
P-ac
E-day
E-tot
State
2016/01/31 10:30
50.000
Summary of Contents for SG50KTL-M-20
Page 1: ...1160mm 8 1 0 m m 405mm ...
Page 2: ...A B C F G D E ...
Page 4: ... ...
Page 5: ...F D A B C Install backplate E Hang inverter 2 2 1 ...
Page 7: ... A B PE L1 L2 L3 N C D ...
Page 8: ... L1 L2 L3 N PE ...
Page 9: ...880 0 DC DC M 6 ...