10
4
Commissioning
Before starting SG36KTL-M, make sure all installation and connections are
completed and verified.
Step 1
Close the AC circuit breaker.
Step 2
Rotate DC switch to “ON” position.
Step 3
Suppose there are sufficient sunlight and enough DC power. PV arrays
initialize and supply DC power to inverter. The LCD display is activated
when DC voltage exceeds inverter startup votlage. If there is a defect on the
display, contact Sungrow.
Button
Operation
Description
Press for less
than 2 seconds
Move upwards or downwards or scroll among set
values. Hereinafter, it is referred to as “Press
”.
Press for more
than two
seconds
Return to the previous menu or cancel the command.
Hereinafter, it is referred to as “Press
ESC
”.
Press for less
than 2 seconds
Move left or right, or turn pages. Hereinafter, it is
referred to as “Press
”.
Press for more
than two
seconds
Enter into the sub-menu or confirm the command.
Hereinafter, it is referred to as “Press
ENTER
”.
Step 4
Press
to choose country code.
Confirm the settings by
Pressing
ENTER
.
Step 5
Select the country code
according to the installation
country of the inverter. Each
country code represents
corresponding local protective
parameters that have been
preset before delivery. Before
country setting, there is warning
screen. Operate according to the
warning information and press
ENTER.