59
F
Fiig
gu
urre
e 7
7--3
3 Initialization protection parameter
Reset the grid protection parameters if the country setting is incorrect.
Otherwise, faults will occur.
In the US region, conformity to UL 1741 includes compliance with applicable
requirements of IEEE 1547, IEEE 1547.1, California Electric Rule 21, Hawaiian
Electric Co. SRD-UL-1741-SA-V1.1 and Supplement SA.
In Canadian region, conformity to CSA C22.2, No.107.1-01.
Step 5
If the inverter is initialized, the App automatically turns to its home page.
-- -- E
En
nd
d
7.4
Function Overview
The App provides parameter viewing and setting functions, as shown in the following
Figure 7-4 App function tree map
.
User Manual