Mechanical Installation
6
35
6.2
Field Installation
6.2.1
Unpacking the Unit
To unpack the SG100KU from the shipping crate:
1. Remove the crate’s wood side and top panels.
2. Remove the barrier bag material from the inverter.
3. Remove the inverter’s anchor hardware that bolts the inverter to the pallet.
−
Remove the front and rear base covers.
−
Unscrew the nuts under the wooden pallet.
−
Pull up the bolts.
Fig 6-5 Cross-section View of the SG100KU Fasten on the Wooden Pallet