P a g e
|
3
TYPICAL 4” X 6” PRESSURE TREATED WOOD
FOUNDATION BASE SET IN GROUND
GREENHOUSE
LOWER “U” RAIL
GROUND LEVEL
CRUSHED ROCK OR GRAVEL
6 MIL VAPOR BARRIER
4” X 6” PRESSURE TREATED WOOD BASE SET INTO GROUND
Page 1: ...ssure treated products If there is an existing concrete pad which you can use you will still need to attach a wood plate Fasten a 2 x 4 pressure treated wood sill plate to the concrete pad using concr...
Page 2: ...ck with your local building department for local codes and requirements Sunglo also recommends using a licensed qualified electrician for all final connections Below are the requirements for electrici...
Page 3: ...a g e 3 TYPICAL 4 X 6 PRESSURE TREATED WOOD FOUNDATION BASE SET IN GROUND GREENHOUSE LOWER U RAIL GROUND LEVEL CRUSHED ROCK OR GRAVEL 6 MIL VAPOR BARRIER 4 X 6 PRESSURE TREATED WOOD BASE SET INTO GROU...
Page 4: ...OOD FRAME 5 COVER THE INSIDE GRAVEL WITH A VAPOR BARRIER IE 6MIL BLACK PLASTIC THEN COVER THE PLASTIC WITH MORE 5 8 CRUSHED ROCK LEVEL TAMP THE ROCK DOWN TO ABOUT BELOW THE TOP OF THE WOOD PLATE 6 IF...
Page 5: ...RESSURE TREATED FRAME TOGETHER COUNTER SINK TWO HOLES ON EACH OF THE FOUR SIDES OF THE FRAME USING A MASONARY DRILL BIT DRILL INTO THE CONCRETE PAD FASTEN THE FRAME TO THE CONCRETE USING WEDGE ANCHORS...