![Sundstrom H06-0421 Operation Instructions Manual Download Page 12](http://html1.mh-extra.com/html/sundstrom/h06-0421/h06-0421_operation-instructions-manual_1395630012.webp)
7. Maintenance schedule
2020-10-05
OI06H-0421 SR 530
12
The schedule represents the minimum requirements for maintenance
routines in order to ensure that equipment will always be in functional
condition.
Before
use
After
use
Annually
Visual inspection
•
•
•
Functional check
•
•
Cleaning
•
•
Change of exhalation
membrane
•