p
age
11
1. Layout floor joists as shown.
2. Line up and insert floor joists into perimeter
bands.
3. Insert 3” screws through pre-drilled holes into
floor joists.
4. Measure the assembled floor framing to
ensure that the floor is square. It should
measure 135-5/8” across both diagonal
measurements. Adjust as needed.
5. Position first piece of flooring on top of
assembled frame, keeping it flush on the side and
front corner.
6. Nail floor decking onto framing, starting with
the corner, using 2” nails every 8 inches.