
14
CAST IRON STOVE AND BURNER SYSTEM
106021
SUN VALLEY STOVE COMPANY
VENTING
INSTALLATION
Continued
Figure 29 - Horizontal Termination Configuration for Rigid Venting Using One
90
°
Elbow
Horizontal Venting
Vertical (V)
Horizontal (H)
60" min.
28" max.
72" min.
48" max.
84" min.
72" max.
96" min.
10' max.
Note: This configuration for use with
corner installation.
Horizontal Termination Configu-
rations
Figures 29 through Figure 31 show differ-
ent configurations for venting with horizon-
tal termination. Each figure includes a chart
with vertical minimum/maximum and hori-
zontal maximum dimensions which must be
met. Seal all connections with high tem-
perature silicone sealant (outer pipe only) as
specified in the second warning statement
on page 11. All horizontal terminations re-
quire 1/4" rise per 12" of horizontal run.
UP
UP
Venting with Two 90
°
Elbows
Vertical (V)
Horizontal (H
1
)
Horizontal (H
1
) +
Horizontal (H
2
)
6' min.
2' max.
8' max.
7' min.
4' max.
10' max.
8' min.
6' min.
12' max.
20' max.
6' max.
12' max.
Figure 30 - Horizontal Termination Configuration for Rigid Venting Using Two 90
°
Elbows