Preparing the Site for System
Installation
Install the Sun Blade 6000 modular system in accordance with the local safety codes
and regulations at the facility site. You must be familiar with and adhere to the safety
precautions in the
Sun Blade 6000 Modular System Safety and Compliance Manual
.
Do not make mechanical or electrical modifications to the equipment. Oracle, Inc. is
not responsible for regulatory compliance of a modified Oracle product.
These topics provide information that you need to prepare your site for system
installation:
■
“Load-Bearing and Handling Precautions” on page 5
■
“Power and Electrical Requirements” on page 6
■
“Cooling Requirements” on page 8
■
“Temperature and Humidity Requirements” on page 9
■
“Airflow Requirements” on page 10
■
“Clearance for Service and Aisle Requirements” on page 10
■
“Route to the Data Center” on page 11
Load-Bearing and Handling Precautions
A fully configured Sun Blade 6000 modular system can weigh in excess of 400
pounds (182 kg) while in its shipping container, and 350 pounds (160 kg) when
unpacked. Any floor that this system will cross, or surface on which the system is
placed, must be able to support these loads.
The system is shipped on a pallet. You must maintain the system in a vertical,
upright position while it is in its shipping container. Be sure you use enough
personnel when moving the system, especially on sloping loading docks and ramps,
Summary of Contents for Sun Blade 6000
Page 1: ...Sun Blade 6000 Modular System Site Planning Guide Part No E20776 02 February 2012 ...
Page 10: ...4 Site Planning Guide for Sun Blade 6000 and Sun Blade 6048 Modular Systems February 2012 ...
Page 18: ...12 Site Planning Guide for Sun Blade 6000 and Sun Blade 6048 Modular Systems February 2012 ...