![Sun Oracle Netra SPARC T3-1B Service Manual Download Page 73](http://html.mh-extra.com/html/sun-oracle/netra-sparc-t3-1b/netra-sparc-t3-1b_service-manual_1393104073.webp)
Preparing for Service
61
3. Pull the server module halfway out (panel 3).
4. Close the ejector arms.
5. Remove the server module from the modular system.
Lift the server module with two hands.
6. Place the server module on an antistatic mat or surface.
7. Insert a filler panel into the empty chassis slot.
Note –
When the modular system is operating, you must fill every slot with a filler
panel or a server module within 60 seconds.
Related Information
■
■
“Install the Server Module Into the Modular System” on page 112
Summary of Contents for Netra SPARC T3-1B
Page 1: ...SPARC T3 1B Server Module Service Manual Part No E29280 02 July 2012 ...
Page 7: ...Contents vii Start the Server Module Host 114 Glossary 115 Index 121 ...
Page 8: ...viii SPARC T3 1B Server Module Service Manual July 2012 ...
Page 12: ...xii SPARC T3 1B Server Module Service Manual July 2012 ...
Page 116: ...104 SPARC T3 1B Server Module Service Manual July 2012 ...
Page 131: ...Glossary 119 W WWID World wide identifier A unique number that identifies a SAS target ...
Page 132: ...120 SPARC T3 1B Server Module Service Manual July 2012 ...