
Chapter 1
Getting Started
1-17
FIGURE 1-7
Inserting the AMC Into a Blade Server
8. Push the ejector latch in fully.
If system power is on and AMC is installed properly, the AMC board Hot-Swap
LED lights up. The Hot-Swap LED blinks for several seconds, then goes off.
If the Hot-Swap LED does not go off after several seconds, push firmly on the
injector/ejector handles to ensure that they are pushed in all the way.