background image

Sun Microsystems, Inc.
www.sun.com

Submit comments about this document at:

http://www.sun.com/hwdocs/feedback

Sun Fire

V1280/Netra

1280

Systems Installation Guide

Part No. 817-3334-12
May 2006, Revision A

Summary of Contents for Sun Fire V1280

Page 1: ...Sun Microsystems Inc www sun com Submit comments about this document at http www sun com hwdocs feedback Sun Fire V1280 Netra 1280 Systems Installation Guide Part No 817 3334 12 May 2006 Revision A...

Page 2: ...NVALID Copyright 2006 Sun Microsystems Inc 4150 Network Circle Santa Clara Californie 95054 Etats Unis Tous droits r serv s Sun Microsystems Inc a les droits de propri t intellectuels relatants la tec...

Page 3: ...Position 1 7 1 1 4 2 Installing the Rail Assemblies in the Top Position 1 8 1 1 5 Installing the Rail Assemblies in a Sun Rack 900 Cabinet 1 9 1 1 5 1 Installing the Rail Assemblies in the Bottom Posi...

Page 4: ...ication 1 34 1 7 Connecting Consoles to the System Controller 1 35 1 7 1 Connecting the Initial Administrative Console 1 36 1 7 2 Connecting the Administrative Console 1 37 1 8 Connecting the I O Asse...

Page 5: ...tents v A 3 2 1 Connecting to a Male 9 Pin D Type Serial Port A 8 A 4 10 100 LOM Ethernet Port A 9 A 4 1 Twisted Pair Ethernet Cable Type Connectivity A 9 A 5 Net0 Net1 Ethernet Ports A 10 Index Index...

Page 6: ...vi Sun Fire V1280 Netra 1280 Systems Installation Guide May 2006...

Page 7: ...radle 1 15 FIGURE 1 9 Aligning the Slides 1 16 FIGURE 1 10 Removing the Shipping Cradle 1 17 FIGURE 1 11 Pushing the System into the System Cabinet 1 18 FIGURE 1 12 Tightening the Securing Screws 1 18...

Page 8: ...ce B Plastic Cover Removed and Connectors Exposed 1 33 FIGURE 1 25 Netra 1280 Power Feed Connectors 1 34 FIGURE 1 26 System Controller and I O Assembly Locations 1 37 FIGURE A 1 External I O Connectio...

Page 9: ...6 TABLE A 4 Default Settings for Connecting to Serial A A 7 TABLE A 5 Pin Interconnections Performed by the Sun DB 25 Adapter A 7 TABLE A 6 Pin Interconnections Performed by a DB 9 9 pin Adapter A 8...

Page 10: ...x Sun Fire V1280 Netra 1280 Systems Installation Guide May 2006...

Page 11: ...broad selection of Sun documentation including localized versions at http www sun com documentation Application Title Safety Sun Fire V1280 Netra 1280 Systems Compliance and Safety Manual Use Sun Fir...

Page 12: ...com hwdocs feedback Please include the title and part number of your document with your feedback Sun Fire V1280 Netra 1280 Systems Installation Guide part number 817 3334 12 Tools Required For the pr...

Page 13: ...1 Installing Slides and Rails on page 1 2 Section 1 2 Installing the System in a Cabinet on page 1 12 Section 1 3 Installing Slide Rail Locking Nuts on page 1 19 Section 1 4 Installing the Cable Manag...

Page 14: ...kit This kit includes the following Two slide lock spacers Two slide lock nuts Four rails two inner and two outer 8 mm wrench Note If you received your system pre einstalled in a cabinet you may proce...

Page 15: ...outer slides Front bracket FIGURE 1 1 Rail Assembly Standard Configuration Adjust the position of the rear bracket or the adjustable bracket to modify the length of the assembly The slide assembly an...

Page 16: ...ide rail assembly 2 Push up on the inner slide so that the locating tab on the side of the system clips over the cutouts in the slide FIGURE 1 2 The spring tab should engage Note The spring clips must...

Page 17: ...Chapter 1 Physical Installation 1 5 FIGURE 1 2 Spring Clips and Cutouts...

Page 18: ...emove the four nuts securing the front bracket 3 Rotate the front bracket 180 degrees and resecure it facing inward FIGURE 1 3 4 Remove the four nuts that secure the rear bracket 5 Rotate the rear bra...

Page 19: ...the rear bracket and resecure the adjustable bracket 2 Adjust the length of each rail assembly a Loosen the four nuts that secure the rear bracket b Reposition the rear bracket to the location marked...

Page 20: ...he bracket in place until it is secured 2 Secure the adjustable bracket into cabinet holes 60 and 67 with two no 10 32 UNF screws 3 Secure the front bracket into cabinet holes 60 and 67 with two no 10...

Page 21: ...1 Installing the Rail Assemblies in the Bottom Position 1 Insert the pins in the front bracket into cabinet holes 22 and 33 FIGURE 1 5 The pins will hold the bracket in place until the bracket is sec...

Page 22: ...etra 1280 Systems Installation Guide May 2006 FIGURE 1 5 Installing the Rails in a Sun Rack 900 Cabinet or 19 Inch Four Post Cabinet Rear bracket secured to outer cabinet holes Front bracket secured t...

Page 23: ...bly a Loosen the four nuts that secure the rear bracket b Reposition the rear bracket to the appropriate markings shown on the slide assembly and resecure the rear bracket 3 Secure the rear bracket wi...

Page 24: ...rt the rackmount securing screws no lower than 18 5 inches and 22 5 inches 47 0 cm and 57 2 cm respectively Refer to the Sun Fire V1280 Netra 1280 Slide Rail Installation Instructions and Mounting Tem...

Page 25: ...Chapter 1 Physical Installation 1 13 c Repeat Step a and Step b for the second front bezel door FIGURE 1 6 Releasing the Door Hinge Mechanism...

Page 26: ...Netra 1280 Systems Installation Guide May 2006 2 Remove the shipping cradle bolts FIGURE 1 7 The bolts secure the orange metal shipping cradle to the wooden pallet FIGURE 1 7 Removing the Shipping Cra...

Page 27: ...ve the system safely into the cabinet using a computer equipment lift 1 Extend the cabinet stabilizer and lock it in position as applicable Caution The shipping cradle must be attached when the system...

Page 28: ...abinet and latch them in the extended position 5 Lift the system until it is level with the outer slides on the cabinet 6 Carefully move the lifting device forward until the slides on the system are f...

Page 29: ...device still supporting the system loosen the four captive screws attaching the handles of the shipping cradle to the system 8 Pull both shipping cradle handles away from the system This disconnects t...

Page 30: ...URE 1 11 FIGURE 1 11 Pushing the System into the System Cabinet 11 Tighten the two securing screws on the front of the system to secure the system in the cabinet FIGURE 1 12 12 Retract the cabinet sta...

Page 31: ...each system prior to moving a cabinet with one or more systems The following procedure is used to secure systems in cabinets when a freestanding system is ordered along with a slide rail kit for moun...

Page 32: ...nd Tightening the Slide Rail Spacers 4 Slide the system into the system cabinet 5 From the rear of the system insert and tighten the locking nut FIGURE 1 14 FIGURE 1 14 Inserting and Tightening the Sl...

Page 33: ...nd CMA 800 The optimum choice of CMA is dependant upon the available depth in the cabinet and the quantity or type of cable to be supported Use the CMA Lite if the larger CMA 800 management arm does n...

Page 34: ...using the two captive screws FIGURE 1 16 2 Secure the center pivot point of the CMA to the inside rear of the left hand rail assembly using the two captive screws 3 Secure the pivot at the end of the...

Page 35: ...17 throughout the following procedure for identification and orientation of CMA parts FIGURE 1 17 Upper Lower CMA Arms and Left Hand Right Hand T Brackets Upper pivot bracket Hinge pin Hinge pin Upper...

Page 36: ...pin securing the pivot bracket to the upper CMA arm which will facilitate attaching the bracket to the system chassis 3 Secure the pivot bracket to the upper left hand side of the system chassis usin...

Page 37: ...5 After attaching the pivot bracket to the chassis use the hinge pin removed previously to secure it to the upper CMA arm FIGURE 1 19 FIGURE 1 19 Attachment of Upper CMA Arm and Pivot Bracket Upper pi...

Page 38: ...et to the system chassis 5 Secure the pivot bracket to the lower left hand of the system chassis using the two captive screws see FIGURE 1 18 6 After attaching the bracket to the chassis secure the lo...

Page 39: ...ter 1 Physical Installation 1 27 7 Secure the left hand T bracket to the left hand slide rail using two captive screws FIGURE 1 21 FIGURE 1 21 Attaching Left Hand T Bracket Slide rail Left hand T brac...

Page 40: ...ra 1280 Systems Installation Guide May 2006 8 Secure the right hand T bracket to the right hand slide rail using two captive screws FIGURE 1 22 FIGURE 1 22 Attachment of Right Hand T Bracket Slide rai...

Page 41: ...T Bracket 10 Secure the lower CMA arm to the left hand T bracket using a single hinge pin FIGURE 1 23 11 Route the cabling through the cable channels as desired and then secure both the upper and lowe...

Page 42: ...system power switch to the Standby position Caution The On Standby power switch does not isolate the equipment The AC power cords are the primary means of disconnection for this product 2 Turn the cab...

Page 43: ...tomer supplied power source A circuit breakers and Source B on the cabinet to the customer supplied power source B circuit breakers Refer to the installation guide that came with the cabinet for instr...

Page 44: ...alified electrician 1 Turn the power switch to the Standby position Caution The On Standby power switch does not isolate the equipment The circuit breakers are the primary means of disconnection for t...

Page 45: ...tem e Ensure that an earth strap for each feed pair is connected to the electrical earth studs FIGURE 1 24 5 Secure the plastic covers with the Phillips no 2 screws FIGURE 1 24 DC Inlet Box With Sourc...

Page 46: ...the Power Input Connections Prior to the Initial Power Application Note The following procedure is intended as a guide only and should only be performed by a qualified electrician Caution Ensure the...

Page 47: ...rms The LOM command line interface and the Solaris OpenBoot PROM console are accessed by connecting an administrative console to either serial port A or the 10 100 LOM Ethernet port The administrative...

Page 48: ...the Serial A port 1 Connect the administrative console to the Serial A port The Serial A port is a DTE data terminal equipment port An adapter cross over or null modem cable is required to connect th...

Page 49: ...t Note Communication on the Serial A port is possible but is subject to interruption by the LOM device Refer to the Sun Fire V1280 Netra 1280 System Administration Guide AC 3 AC 2 AC 1 AC 0 SOURCE A S...

Page 50: ...al access to the system domains 1 Connect one end of the I O Ethernet cable to the Net0 Net1 Ethernet port FIGURE 1 26 2 Connect the other end of the I O Ethernet cable to the hub workstation or perip...

Page 51: ...boards refer to the Sun Fire V1280 Netra 1280 Systems Service Manual for instructions Caution During initial installation turn off the power at the circuit breakers before removing or replacing syste...

Page 52: ...com for the mounting hole numbers of the mounting screws for Sun Microsystems disk arrays other storage trays and devices Unless otherwise specified in the Rackmount Placement Matrix mount the heavies...

Page 53: ...al system controller ports one reserved 10 100 LOM Ethernet port system controller Ethernet port Net0 Net1 Ethernet port Two gigabit Ethernet RJ 45 ports FIGURE A 1 External I O Connections Sun Fire V...

Page 54: ...and 1 2 and 3 and 4 and 5 A 1 1 PCI IB_SSC Assemblies PCI IB_SSC assemblies provide six I O slots labeled 0 through 5 When viewing the rear of the system slot 0 is on the left and slot 5 is on the ri...

Page 55: ...ound GND 5 DB P1 I O 28 C D I O 51 Termpwr POWER 6 DB 0 I O 29 REQ I O 52 Termpwr POWER 7 DB 1 I O 30 I O I O 53 Reserved NA 8 DB 2 I O 31 DB 8 I O 54 Ground GND 9 DB 3 I O 32 DB 9 I O 55 ATN I O 10 D...

Page 56: ...s 82 ft 25 meter for low voltage differential point to point interconnect For PCI PCI X compatible IB_SSC assemblies the embedded SCSI subsystem is SCSI Ultra 320 UltraSCSI low voltage differential pa...

Page 57: ...nal Name Description State 1 Not connected 2 Not connected 3 Not connected 4 Not connected 5 SYSTEM_NO UNIX Running Normally open 6 SYSTEM_NC UNIX Running Normally closed 7 SYSTEM_COM UNIX Running Com...

Page 58: ...ors FIGURE A 4 These ports are also known as the system controller serial ports TABLE A 3 lists the pinout information FIGURE A 4 RJ 45 Serial Connectors Note Serial port B is reserved TABLE A 3 RJ 45...

Page 59: ...er supplied with your system part number 530 2889 or an alternative adapter that performs the same pin interconnections The Sun supplied DB 25 adapter enables you to connect to any Sun system TABLE A...

Page 60: ...25 adapter to an adapter that has one 25 way female connector and one 9 way D type female connector Sun does not supply a 25x9 way D type female to female adapter 3 Connect the male end of a 9 pin se...

Page 61: ...twisted pair STP cable Category 3 STP 3 voice grade Category 4 STP 4 Category 5 STP 5 data grade For 100BASE T applications shielded twisted pair category 5 STP 5 data grade cable TABLE A 7 Twisted p...

Page 62: ...rs FIGURE A 6 The Net0 Net1 Ethernet ports are also known as the gigabit Ethernet RJ 45 ports TABLE A 9 lists the pinout information FIGURE A 6 RJ 45 Gigabit Ethernet Connectors TABLE A 9 RJ 45 Gigabi...

Page 63: ...Index 1 Index C cable lengths STP 5 A 9 connectivity TPE A 9 E Ethernet TPE connectivity A 9 external cables lengths A 9 R retention nut installing 1 19 retention washer installing 1 19...

Page 64: ...Index 2 Sun Fire V1280 Netra 1280 Systems Installation Guide May 2006...

Reviews: