22
Sun Enterprise 10000 Dual Power Grid Installation Guide • March 2000
FIGURE 11
Criss-Cross Method of Installing Power Cables
5. Install labels “POWER GRID B” to the side of the option power shelves so that
the labels are visible when the inside of the chassis is viewed from the front or
back.
Install the labels in a similar position as on the existing power shelves (
).
6. Install the option power shelf in the front of the chassis with the AC input
module toward the outside of the chassis so that it is a mirror image to the power
shelf next to it.
Install one screw in the lower hole of the outer flange. Do not install the other screws
at this time.
Note –
Only one screw is installed to secure the power shelf while cables are being
attached.
Front power shelf
Bus box
Rear option
power shelf
Rear power shelf
Front option
power shelf