Installation Procedure
41
Close the Chassis and Apply Power
1. Install all doors and chassis covers on the chassis.
2. Turn on all switches and circuit breakers.
3. Make sure that the ACIM DC ON LEDs are green and all others are amber.
4. Verify that the Hostview display on the SSP indicates green for the control boards
and green for the Grid A power supplies.
Note –
Future SSP revisions will indicate the status of Grid B power supplies.