background image

Sun Microsystems, Inc.
901 San Antonio Road
Palo Alto, CA 94303-4900 U.S.A.
650-960-1300

Send comments about this document to:

[email protected]

Sun StorEdge

T3 and T3+ Array

Telco Rack Installation Guide

Part No. 806-5133-11
August 2001

, Revision A

Summary of Contents for StorEdge T3+

Page 1: ...901 San Antonio Road Palo Alto CA 94303 4900 U S A 650 960 1300 Send comments about this document to docfeedback sun com Sun StorEdge T3 and T3 Array Telco Rack Installation Guide Part No 806 5133 11 August 2001 Revision A ...

Page 2: ...tems Inc 901 San Antonio Road Palo Alto CA 94303 4900 Etats Unis Tous droits réservés Ce produit ou document est distribué avec des licences qui en restreignent l utilisation la copie la distribution et la décompilation Aucune partie de ce produit ou document ne peut être reproduite sous aucune forme par quelque moyen que ce soit sans l autorisation préalable et écrite de Sun et de ses bailleurs d...

Page 3: ... 2 of the Sun StorEdge T3 and T3 Array Installation Operation and Service Manual Note Before beginning the installation refer to the requirements for operating a Sun StorEdge T3 and T3 array in a standard 19 inch EIA RETMA rack as described in Appendix A of the Sun StorEdge T3 and T3 Array Site Preparation and Planning Guide Make sure that the rack you are using meets the specified requirements Th...

Page 4: ...right rail 1 340 6529 01 Telco left rail 1 340 6530 01 Telco rear bracket 4 340 6031 01 Support plate 2 240 3017 01 Screw 10 32x3 8 in 12 240 3840 01 Screw 12 24x1 2 in 8 240 3768 01 Screw 10 32x5 16 in 8 TABLE 2 Related Documentation Application Title PartNumber Preparing for the installation Sun StorEdge T3 Disk Tray Site Preparation and Planning Guide 806 4212 Installation overview Sun StorEdge...

Page 5: ...anning Guide Install the array in the first empty slot at the bottom of the rack If you are installing more than one array continue installing arrays from the bottom up If you are installing a array partner group install the master unit in the lowest empty slot available and install the alternate master unit in the next slot up Install all array partner groups in this order Use two people to lift ...

Page 6: ...ust 2001 2 Using a Phillips screwdriver remove the four screws that secure the feet to the array FIGURE 1 FIGURE 1 Removing the Feet 3 Secure the support plate to the array using four screws part number 240 3768 01 provided in the rackmount kit FIGURE 2 Bottom Front ...

Page 7: ...Rack Installation 5 FIGURE 2 Attaching the Support Plate to the Array 4 With the aid of an assistant restore the array to the upright position Support plate Front ...

Page 8: ...orEdge T3 and T3 Array Telco Rack Installation Guide August 2001 Suitable Rack Configurations This rackmount kit is suitable for use in the following rack configurations FIGURE 3 2 Post Telco Rack Configuration ...

Page 9: ...RE 4 4 Post Telco Rack Configuration Attaching the Side Rails to a 4 Post Rack 1 Secure the rack with rigid connections stably to the floor and ceiling as appropriate refer to the rack manufacturer s installation instructions ...

Page 10: ...IGURE 5 Attaching the Brackets to the Side Rails 3 Position the left side rail in the rack in the lowest empty slot aligning the holes in the rail with the holes in the rack FIGURE 6 4 Secure the left side rail to the rack a Tighten the screws of the brackets at the back of the rail b Secure the front of the rail using two screws part number 240 3840 01 provided in the rackmount kit Left side rail...

Page 11: ...Rack Installation 9 FIGURE 6 Attaching the Side Rails to the Rack c Secure the back of the rail FIGURE 7 using two screws part number 240 3840 01 provided in the rackmount kit Front of rack Back of rack ...

Page 12: ...cure the rack stably with rigid connections to the floor and ceiling as appropriate refer to the rack manufacturer s installation instructions Note Rear brackes are optional for 2 post rack configurations 2 Position the left side rail in the rack to the lowest empty slot aligning the rail with the holes in the rack 3 Secure the left side rail to the rack Secure the front of the rail using two scre...

Page 13: ...ation 11 FIGURE 8 Attaching side rails to a 2 post rack 4 Repeat Step 3 to attach the right rail to the rack Make sure to align the left rail with the right rail Note Brackets are optional for 2 post configurations ...

Page 14: ...ing installed Unless your rack is bolted to the floor ensure that the stabilizer legs are extended before proceeding Failure to extend the legs can result in the rack tipping forward and injuring personnel Caution This installation requires two people to lift and move the array Use care to avoid injury A array with a support plate attached can weigh up to 87 pounds 39 kg 1 With the aid of an assis...

Page 15: ...Rack Installation 13 2 Align the array with the side rails and slide the array in the rack FIGURE 10 FIGURE 10 Sliding the Array in the Rack Back of rack Front of rack ...

Page 16: ...llation Guide August 2001 3 Secure the array to the side rails by inserting two screws part number 240 3017 01 into the support plate at the back of the array chassis FIGURE 11 FIGURE 11 Securing the Array to the Side Rails Back of rack Front of rack ...

Page 17: ...to cable the arrays Caution If you need to remove the array make sure you have someone to assist you one of you should be positioned at the front of the rack and the other one should be at the back The person at the back of the rack can push it forward slightly after removing the mounting screws The person at the front of the rack should be ready to take hold and stabilize the tray once it starts ...

Page 18: ...16 Sun StorEdge T3 and T3 Array Telco Rack Installation Guide August 2001 ...

Reviews: