Summit Z Beam Shelving Assembly Instructions Manual Download Page 1

100

 

 

102

 

Kirkham

 

Rd

 

West,

 

Keysborough,

 

3173

 

VIC

 

Ph:

 

1800

 

352

 

999

 

W:

 

www.summit.com.au

 
 

 

 

Assembly

 

Instructions

 

Z

 

Beam

 

Shelving

 

 

Please

 

read

 

instructions

 

COMPLETELY

 

prior

 

to

 

assembly

 

 

Caution

 

 

Keep

 

small

 

children

 

clear

 

during

 

assembly.

 

 

Handle

 

components

 

with

 

care

 

due

 

to

 

sharp

 

edges.

 

 

Tools

 

Required

 

 

Rubber

 

Mallet

 

or

 

Hammer.

 

 

Helpful

 

Hints

 

 

Use

 

a

 

cloth

 

or

 

wooden

 

block

 

to

 

protect

 

the

 

components

 

when

 

hammering.

 

 

Hammer

 

gently

 

to

 

avoid

 

component

 

damage.

 

 

Drive

 

rivets

 

to

 

the

 

bottom

 

of

 

the

 

keyhole

 

by

 

striking

 

the

 

beam

 

near

 

the

 

joint.

 

 

Recommendations

 

 

Wear

 

gloves

 

during

 

assembly.

 

 

Two

 

persons

 

assemble

 

the

 

unit.

 

 

Assemble

 

the

 

unit

 

on

 

solid

 

level

 

surface.

 

 

Heaviest

 

items

 

to

 

be

 

loaded

 

on

 

lower

 

shelves.

 

 

Loads

 

to

 

be

 

evenly

 

distributed.

 

 

Parts

 

List

 

 

 

 

 

A

 

 

Uprights

 

(8)

 

B

 

 

Long

 

Beam

 

(10)

 

C

 

 

Short

 

Beam

 

(10)

 

 

 

 

D

 

 

Shelf

 

Deck

 

(5)

 

E

 

 

Post

 

Cap

 

(8)

 

F

 

 

Post

 

Joiner

 

(4)

 

 

 

 

G

 

 

Post

 

Clips

 

(2)

 

 

 

 

 

Summary of Contents for Z Beam Shelving

Page 1: ...r Helpful Hints Use a cloth or wooden block to protect the components when hammering Hammer gently to avoid component damage Drive rivets to the bottom of the keyhole by striking the beam near the joi...

Page 2: ...u have all the parts listed Step 2 Join two uprights with a short beam to form a bottom end frame as per diagram 1 Drive the rivets to the bottom of the keyhole by hitting the beam near the joint with...

Page 3: ...eat step 2 to create a second bottom end frame and then join the two bottom end frames together with long beams as per diagram 2 Diagram 2 Step 4 Create a top end frame by joining two uprights with a...

Page 4: ...tom end frames using post joiners as per diagram 4 A second person to hold the top end frames steady at this point is advised Diagram 4 Step 7 Insert a short beam to the mid section of the top and bot...

Page 5: ...999 W www summit com au Step 8 Add two long beams to the top of the unit as per diagram 6 Diagram 6 Step 9 Assemble the remaining long and short beams to create two additional shelf levels as per diag...

Page 6: ...into final position and then lay the shelf decks on top of the beams as per diagram 8 Work from the bottom up Insert post caps on the top and bottom of the uprights Diagram 8 It is recommended that y...

Page 7: ...iddle shelf level can be set to desired height Diagram 9 Step 1 3 Build the secondary bay end frame as per diagram 10 Please note that for stability the bottom shelf level needs to be in the 7th and 8...

Page 8: ...final location then lay shelf decks on top of the beams as per diagram 12 Diagram 12 Step 1 6 Secure the two bays by aligning the middle uprights and firmly clamping together with a post clip as per...

Reviews: