6.3
Remove the valve sleeve and check all connection for leaks. Please recover the valve sleeve after leaking test.
Please shut off your hot and cold water supply again if no leaking.
6.4
Drill the mounting holes exactly according to mixer valve and elbow position, done the finish wall.