SUMERAIN S2134BGI Installation Manual Download Page 10

 

 

4.4

 

Apply Teflon tape on the thread of tube inlet and then connect to rough-in valve.   

Rough-in Valve thread for Hot&Cold water inlet:    NPT 1/2

” [US/CA] 

                                                                                          G1/2

” [EU&UK] 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

4.5

 

Install finish wall

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for S2134BGI

Page 1: ...MODEL S2134XI Version V1 2 WALL MOUNTED ROMAN TUB FAUCET MODEL FINISH S2134CI CHROME S2134NI BRUSHED NICEKL S2134DI MATTE BLACK S2134BGI BRUSHED GOLD HOT LINE 1 866 203 0866...

Page 2: ...questions regarding this product call 1 866 203 0866 or email to supports sumerain com Sincerely SUMERAIN customer service department 1 Unpack your new product and ensure that all the parts are conta...

Page 3: ...ILL NOT PAY FOR A Conditions malfunctions or damage not resulting from defects in material or workmanship B Conditions malfunctions or damage resulting from normal wear and tear improper installation...

Page 4: ...eight Adjustable Spout Reach 11 0 Inch 280mm Spout Height Adjustable Spout rotatable No Installation type Wall mount Valve Type Ceramic disc Faucet Body Material Brass Spout Material Brass Handle Mate...

Page 5: ...FRONT VIEW OF FAUCET LEFT VIEW OF FAUCET...

Page 6: ...TOP VIEW OF FAUCET...

Page 7: ...it remove the old unit and clean the mounting surface thoroughly 3 CHECKING THE CONTENTS OF THE BOX Upon opening the box check to ensure that all the following items are included CODE ITEM NAME QTY CO...

Page 8: ...LATION 4 1 Make a mounting rack normally use woods as materials for preparing install the rough in valve trim The mounting board s face should be 2 11 16 68mm at least and max 3 1 16 78mm behind the f...

Page 9: ...ewdriver Notice Please make sure the valve is horizontal 4 3 Turn on your shut off valve for cleaning the hot and cold water supply tube before connect to the valve trim allow the water flush 3 5 minu...

Page 10: ...4 4 Apply Teflon tape on the thread of tube inlet and then connect to rough in valve Rough in Valve thread for Hot Cold water inlet NPT 1 2 US CA G1 2 EU UK 4 5 Install finish wall...

Page 11: ...4 6 Apply Teflon tape on the thread of spout feed pipe 4 7 Attach flange to spout...

Page 12: ...4 8 Install spout to rough in valve 4 9 Attach the flange to finish wall...

Page 13: ...4 10 Attach the foam to escutcheon 4 11 Attach and fasten the escutcheon to finish wall...

Page 14: ...he knobs to cartridge stem with screw by Allen wrench and push the screw cover in ASSEMBLE FINISHED 5 INSPECTION 5 1 Turn on hold and cold water supply and check all connection for ensuring no leaking...

Page 15: ...condition please rub it with aluminum foil dipped in water until the surface is nice and smooth and wipe it use a small amount of chrome polish or maybe something like car wax such as Meguiar Turtle W...

Reviews: