
5. INSTALLATION
5.1
Turn on your shut-off valve for cleaning the hot and cold water supply pipe before connect to the faucet, allow the water flush 3~5
minutes to flush out dirt and debris. Shut off the water supply again after done.
5.2
Make a mounting rack (normally use woods as materials) for preparing install the concealed box assembly .the mounting board
’s
face should be Min 48mm [1-7/8"] and Max 87mm [3-13/32"] behind the finish wall surface.
WARNING: Incorrect installation deep may result in huge rework cost.