![SUMERAIN S2121BGW Installation Manual Download Page 8](http://html1.mh-extra.com/html/sumerain/s2121bgw/s2121bgw_installation-manual_1390588008.webp)
SUMERAIN SANITARY GROUP WWW.SUMERAIN.COM
4. PLANNING AND INSTALLATION INSTRUCTIONS
Attentions:
The faucet has to be installed, rinsed and checked in compliance with the applicable regulations in
order to guarantee proper shower function!
Operating pressure at the control valve:
Max. 1Mpa. Recommended operating pressure: 3 bar pressure.
Hot water temperature: Max 60 degree centigrade (140 Fahrenheit).
5. INSTALLATION
5.1
Turn on your shut-off valve for cleaning the hot and cold water supply pipe before connect to the faucet, allow the water
flush 3~5 minutes to flush out dirt and debris. Shut off the water supply again after finish.
HOT WATER SUPPLY COLD WATER SUPPLY
5.2
Make a mounting rack (normally use woods as materials) for preparing install the rough-in valve assembly .the mounting
board’s face should be Min 54mm (2-1/8”) and Max 65mm (2-9/16”) behind the finish wall surface