5. INSTALLATION
5.1
Turn on your shut-off valve for cleaning the hot and cold water supply pipe before connect to the faucet, allow the water flush
3~5 minutes to flush out dirt and debris. Shut off the water supply again after finish.
5.2
Attach the shank to the bottom of your faucet.