
SUMERAIN SANITARY GROUP WWW.SUMERAIN.COM
4. PLANNING AND INSTALLATION INSTRUCTIONS
Attentions:
The faucet has to be installed, rinsed and checked in compliance with the applicable regulations in
order to guarantee proper shower function!
Operating pressure at the control valve:
Max. 1Mpa. Recommended operating pressure: 3 bar pressure.
Hot water temperature: Max 60 degree centigrade (140 Fahrenheit).
5. INSTALLATION
5.1
Turn on your shut-off valve for cleaning the hot and cold water supply pipe before connect to the faucet, allow the water
flush 3~5 minutes to flush out dirt and debris. Shut off the water supply again after finish.
HOT WATER SUPPLY COLD WATER SUPPLY
5.2
Install the cold and hot water supply elbow connecter(NPT 1/2-14 in US/CA,BSPP 1/2” in UK&Other region), the interval of
the two supply elbow connector should be min 63mm (2-1/2”) and max 243mm (9-9/16”), the elbow connector’s face should
be Min 12mm (15/32”) and Max 15mm (19/32”) reach out the finish wall surface. Replace existing tub filler faucet maybe need
flange ”B” to match if the elbow connectors’ reach is less than 5mm(3/16”)