1.1 g
enerAl
nOtes
On
sAfety
This operation manual is applicable for the machine BEA
16.
The machine may only be handled by personnel
who are qualified.
1.2 u
se
Of
the
mAchine
fOr
purpOses
fOr
which
it
is
intended
The machine is suitable for all machining operations need-
ing axial force and torque like drilling, reverse drilling, chip
breakage, countersinking, and reverse countersinking.
The machine is designed for taps conforming to standard
specifications. The machine is specifically ideal for plant
construction, but may also be used as standalone appli-
cation if controlled accordingly.
1.3 i
ncOrrect
use
All uses other than those described under section
1.2 are regarded as incorrect use and are there-
fore not admissible.
1.4 d
eclArAtiOn
Of
incOrpOrAtiOn
The manufacturer Otto Suhner AG of Industriestrasse 10,
CH-5242 Lupfig, hereby declares for the partly completed
machinery (see reverse side for type and serial no.) that
the following fundamental requirements of the Directive
2006/42/EC are applied and fulfilled in accordance with
Annex I: 1.1.2, 1.1.3, 1.1.5, 1.2.1, 1.2.2, 1.3.7, 1.3.8.1, 1.5.1,
1.5.4, and 1.6.1. Technical documentation was generated
for the partly completed machinery in accordance with
Annex VII of the Machinery Directive. Document Agent:
I. Sebben. Authorised sites are provided with this techni-
cal documentation in paper or electronic form on justified
request. This partly completed machinery may be put into
operation only when the machine in which the partly com-
pleted machinery is to be incorporated has been ascer-
tained to fulfil the conditions under the Machinery Direc-
tive. CH-Lupfig, 08/2018.
I. Sebben/Division manager
2. c
ommissioning
2.1 A
ssemBly
instructiOns
Maximum admissible machine fastening
error.
The machine is fastened at the bores pro-
vided in the housing.
Screws of quality grad 8.8 must be used. The starting tor-
que for the holding down bolt is maximum 25Nm.
1. n
otEs
on
s
aFEty
Connect the cables only after the machine has
been completely installed.
2.1.1 f
Astening
Of
the
mAchine
On
its
mOunt
Correct lifting of machine with a crane.
2.2 c
Onnecting
the
pOwer
tO
the
mAchine
The control must first be wired befor it is
connected to the power supply.
2.2.1 A
synchrOnOus
mOtOr
Connect to 41N1, X5 on the control. Connect the shielding
to the earthing module on the control.
36
Summary of Contents for BEA 16
Page 2: ...English Spare Parts Fran ais Pi ces de rechange Deutsch Ersatzteile 2 2...
Page 3: ...Portug es Pe as de reposi o Espa ol Refacciones Italiano Pezzi di ricambio 3 3...
Page 4: ...English Outline dimension Fran ais Croquis de dimensions Deutsch Massbilder 4 4...
Page 5: ...Portug es Croquis cotado Espa ol Croquis de dimensions Italiano Piano delle dimension 5 5...
Page 6: ...English Outline dimension Fran ais Croquis de dimensions Deutsch Massbilder 6 6...
Page 7: ...Portug es Croquis cotado Espa ol Croquis de dimensions Italiano Piano delle dimension 7 7...
Page 10: ...English Diagrams Fran ais Sch mas Deutsch Schemas 10 10...
Page 11: ...Portug es Esquemas Espa ol Esquemas Italiano Schemi 11 11...
Page 12: ...English Diagrams Fran ais Sch mas Deutsch Schemas 12 12...
Page 13: ...Portug es Esquemas Espa ol Esquemas Italiano Schemi 13 13...
Page 14: ...English Diagrams Fran ais Sch mas Deutsch Schemas 14 14...
Page 15: ...Portug es Esquemas Espa ol Esquemas Italiano Schemi 15 15...
Page 16: ...English Diagrams Fran ais Sch mas Deutsch Schemas 16 16...
Page 17: ...Portug es Esquemas Espa ol Esquemas Italiano Schemi 17 17...
Page 18: ...English Diagrams Fran ais Sch mas Deutsch Schemas 18 18...
Page 19: ...Portug es Esquemas Espa ol Esquemas Italiano Schemi 19 19...