Site Preparation
5
subzero.com/specs
Before You Start
Make sure the opening dimensions, door clearance,
electrical service and plumbing are correct for the model
you are about to install. Refer to specifications on the
following pages.
IMPORTANT NOTE:
To operate properly, the door must
open a minimum of 90°. Use a minimum 3"
(76)
filler in
corner installations to assure a 90° door opening. Allow
enough clearance in front of the unit for full door swing.
TOOLS AND MATERIALS REQUIRED
•
Appliance dolly able to support 130 lbs
(59 kg)
•
Level — 2'
(.6 m)
and 4'
(1.2 m)
recommended
•
Phillips and slotted screwdriver sets
•
Wrench set and allen wrench set
•
Crescent wrenches
•
Various sized pliers
•
5
/
16
" hex bolt nut driver
•
Drill and assorted drill bits
•
Model UC-24CI—4'
(1.2 m)
of
1
/
4
" copper, braided
stainless steel or PEX tubing and saddle valve for
water line (do not use self-piercing valves).
•
Model UC-24CI—Tubing cutter.
•
Masonite, plywood,
1
/
8
" pressed fiberboard, cardboard
or other suitable material to protect finished flooring