background image

Installation Information

2-2

#7005333 - Revision C - September, 2010

Built-In (BI) Series

Built-In (BI) Series

INSTALLATION CONSIDERATIONS

This section uses some of the information in the BI Series Installation Guide to address common installation issues
seen by Service Technicians.  Improper installation, though not a valid service issue, has the potential to lead to a
call for service.  Installation related complaints could include, but are not limited to:  Unit leveling, unit movement,
door misalignment, improper door and drawer sealing, internal frost or condensation, exterior condensation, warm
compartment temperatures, etc. 

The Built-In line offers the following design alternatives - framed, overlay and stainless steel models. The overlay
design has two possible installation applications - standard overlay and flush inset.  Each of these design options
has specific installation requirements, which means it is vital that the unit match the planning and space needs.

NOTE:

If additional installation information is needed, refer to the complete Installation Guide, or contact Sub-Zero

Service Department.

Tools and Materials Required

The following is a list of tools and materials that will assist in a proper installation.

• Phillips screwdriver set
• Slotted screwdriver set
• 6-Lobe, Torx type drive screwdriver set (Specific sizes, T-10, T-20 and T-25)
• 4' (1.2 m) of 1/4" copper tubing and saddle
• valve for the water line—part #4200880
• (do not use self-piercing valves)
• Copper tubing cutter
• Level - 2' (.6 m) and 4' (1.2 m) recommended
• Appliance Dolly able to support 700 lbs (317 kg) and adequate manpower to handle the weight of the unit
• Various sized pliers
• Wrench set
• Allen wrench set
• 5/16" hex bolt nut driver
• Crescent wrenches
• Cordless drill and assorted drill bits
• Masonite, plywood, 1/8" pressed fiberboard, cardboard or other suitable material to protect finished flooring
• Appropriate materials to cover and protect the home and its furnishings during installation

Site Preparation

The finished rough opening where the Built-In unit is to be installed must be properly prepared. Refer to the Finished
Rough Opening Specifications for the specific model on the following pages.  The specifications for the framed, over-
lay and stainless steel applications are identical.  The Finished Rough Opening Specifications are different for the
flush inset application, whether using custom panels or Sub-Zero accessory stainless flush inset panels. Make sure
that the rough opening dimensions, door swing clearance, electrical service and plumbing are correct for the model
being installed.

If installing two Built-In units side by side in the framed, overlay or stainless steel application, a separating filler strip
is recommended. Add the filler strip width to the finished rough opening dimension, and ALWAYS complete the
installation with the Anchoring Kit components.

For installation of two Built-In units side by side in the flush inset application, a dual installation kit will be necessary.

IMPORTANT NOTE:

Built-in units installed side by side in the flush inset application cannot use the standard Sub-

Zero accessory overlay panels, and must have opposing hinges.

IMPORTANT NOTE: 

To operate properly, the door must open a minimum of ninety (90) degrees.  Use a minimum 3"

(76) filler in corner installations to assure a ninety (90) degree door opening.  Allow enough clearance in front of the
unit for full door swing.

IMPORTANT NOTE:

Make sure the floor under the unit is level with the surrounding finished floor.

Summary of Contents for Sub-Zero BI series

Page 1: ...set Allen wrench set 5 16 hex bolt nut driver Crescent wrenches Cordless drill and assorted drill bits Masonite plywood 1 8 pressed fiberboard cardboard or other suitable material to protect finished...

Page 2: ...610 OPENING DEPTH 1 2 13 18 457 6 152 24 610 OPENING DEPTH SHUT OFF VALVE OUTLINE OF FRAMED OVERLAY OR STAINLESS STEEL MODEL TOP VIEW ANTI TIP BRACKET MUST NOT INTERFERE WITH WATER LINE REFER TO INSTA...

Page 3: ...8 457 6 152 24 610 OPENING DEPTH SHUT OFF VALVE OUTLINE OF FRAMED OVERLAY OR STAINLESS STEEL MODEL TOP VIEW ANTI TIP BRACKET MUST NOT INTERFERE WITH WATER LINE REFER TO INSTALLATION INSTRUCTIONS FOR C...

Page 4: ...GHT A OPENING WIDTH 3 76 24 610 OPENING DEPTH 1 2 13 18 457 6 152 24 610 OPENING DEPTH SHUT OFF VALVE OUTLINE OF FRAMED OVERLAY OR STAINLESS STEEL MODEL TOP VIEW ANTI TIP BRACKET MUST NOT INTERFERE WI...

Page 5: ...unit NOTE Both brackets MUST be used Wood Floor Applications See Figure 2 4 After properly locating anti tip brackets in rough opening drill pilot holes 3 16 diameter maximum Then use the 12 X 2 1 2 P...

Page 6: ...19 mm If 12 X 2 1 2 screws do not hit a wall stud or the wall plate in any of the brackets back holes use the 8 18 X 1 1 4 PH Truss HD Screws and 12 Flat Washers with the Nylon Zip It Wall Anchors Con...

Page 7: ...ter pres sure between 30 psi 2 1 bar to 100 psi 6 9 bar IMPORTANT NOTE A reverse osmosis system can be used provided there is constant water pressure of 30 psi 2 1 bar to 100 psi 6 9 bar supplied to t...

Page 8: ...is this section IMPORTANT NOTE The customer should be made aware that the ice maker will not produce ice immedi ately and that the first few batches of ice produced should be discarded allowing twenty...

Page 9: ...illustration below for location of the rear roller base adjustment IMPORTANT NOTE Be sure to reference level of the unit to the floor not squareness of the unit to the sur rounding cabinetry This coul...

Page 10: ...allen wrench to turn the bolt mounted front to back in the top hinge assembly in the appropriate direction See Figure 2 13 LEFT TO RIGHT ADJUSTMET BOLT IN AND OUT ADJUSTMET BOLT MOUNTING BOLTS Figure...

Page 11: ...ed on a framed application it may be neces sary to router a recessed area into the panel for proper finger clearance under the door handle Optional extended handles are also available that offer an ad...

Page 12: ...Figure 2 18B Handle Side Trim Removal Drawer Handle Handle Side Trim Removal Procedure 1 At the back right hand side of the drawer handle or handle side trim insert a flat blade screwdriver into the n...

Page 13: ...ure 2 19 then pull the rivets out 2 Pull the dispenser control panel down and disconnect the ribbon cable See Figure 2 20 NOTE When reassembling a Make sure blue side of ribbon cable is up when connec...

Page 14: ...the surrounding cabinetry Anchoring Procedure 1 Open the grille then install anchor screws through the grille frame clearance holes and the grill frame support brackets into the cabinetry See Figure...

Reviews: