background image

7

10

1

3

2

6

5

4

7

8

stûv microMega – installation of ready-to-fit cladding - 0512

installation

removal of the door 

The ready-to-fit Stûv cladding is 
attached to the micromega without 
the door. 

Therefore the first step is to remove 
the door. 

- Ensure the glass door is fully pulled 
down.

- Tilt the door. 

- Unfasten the counterbalances and 
position them so that they rest against 
the bottom of the frame.

Once the door is open, it is 
recommended to block it in this 
position. To do this, screw 2 M6 
screws to the base of the lower hinge 
part [diagram 5].

Summary of Contents for uM

Page 1: ...installation installatie installazione instalación instalação instalace installation installatie installa zione instalación instalação instalace installation installatie installazione instalación instalação instalace installation installatie installazione instalación instalação instalace installation installatie installazione instalación instalação instalace installation installatie installazione ...

Page 2: ...ct your supplier We recommend that you read these instructions prior to installation Some configurations might have an impact on the sequence of operations to be performed Presentation of the product 3 Dimensions 3 Recommendations 3 Overview 4 Preparation of the area 5 Tools 5 Preparation of the stove 5 Screws required 6 Installation 7 Removal of the door 7 Assembly of the body part for the ready ...

Page 3: ...l Once the cladding has been installed hand these instructions over to the user Signing the delivery forms signifies that you accept the product and acknowledge that the merchandise is compliant with the merchandise ordered It is therefore very important to check the integrity of the merchandise on delivery Adhere to the maintenance guidelines Any modification made to this cladding may create the ...

Page 4: ...4 10 12 13 2 22 21 11 24 217 23 8 7 1 17 3 4 Stûv microMega installation of ready to fit cladding 0512 Overview ...

Page 5: ...ation of ready to fit cladding 0512 Preparation of the area Tools Préparation du foyer A micromega Stûv fitted with ready to install cladding can only be connected to an outside air inlet with a special duct diagram 3 4 Preparation of the stove ...

Page 6: ...M6 hexagonal nut grooved washer 52113022 Tork screw DIN 7380 M4X8 52123001 DIN 125A M6 washer 52114003 Adjustable base 52120002 DIN 7504 M4X16 screw 52103007 Guide runner 55997081 Please note The F guide runner is a bumper It is not resistant to high temperatures Do not use for any purpose other than that intended ...

Page 7: ...omega without the door Therefore the first step is to remove the door Ensure the glass door is fully pulled down Tilt the door Unfasten the counterbalances and position them so that they rest against the bottom of the frame Once the door is open it is recommended to block it in this position To do this screw 2 M6 screws to the base of the lower hinge part diagram 5 ...

Page 8: ...8 3 17 D C 217 23 D D 4 24 1 2 3 4 Stûv microMega installation of ready to fit cladding 0512 Assembly of the body part for the ready to fit fireplace ...

Page 9: ...9 D D 5 6 7 8 9 Stûv microMega installation of ready to fit cladding 0512 Assembly of the body part for the ready to fit fireplace Use thermal insulation to cover the full length of the duct diagram 7 ...

Page 10: ... position them independently on the stove diagram 4 Please note When a façade is installed onto a fitted stove the management of the hot air inlets and outlets is the responsibility of the installation engineer The installation of the stove its accessories and the materials that surround it must comply with all regulations local and national and all standards national and European ...

Page 11: ...11 7 8 9 D 13 10 11 13 14 12 10 11 Stûv microMega installation of ready to fit cladding 0512 Assembly of the façade ...

Page 12: ...microMega installation of ready to fit cladding 0512 Assembly of the façade Ensure the two pins are properly in their grooves It may be necessary to realign the blanks slightly in order to ensure the holes and pins are opposite one another ...

Page 13: ...13 24 25 22 23 E Stûv microMega installation of ready to fit cladding 0512 Assembly of the façade Lift the central part of the shelf slightly when sliding it diagram 24 ...

Page 14: ...tely before carrying out maintenance Clean with a dry cloth Use a traditional non abrasive household detergent to clean the surfaces Never use solvents acetone white spirit Marks left by indelible markers cannot be removed If necessary Stûv can provide a spray canister for touch up work Please contact your dealer about this ...

Page 15: ...d S050 4NT Eastleigh Hampshire T 0870 727 0105 jetmastersales aol com www jetmaster co uk Importer for Finland Ilkka Alatarvas OY Pikkujärventie 4B 01680 Vantaa T 400 872 858 www takkamaailma com Importer for Sweden Eldoform Sverige AB Slipgatan 2 117 39 Stockholm T 0707 883 53 www eldoform se Importer for Denmark Stove APS Aldershvilevej 84 2880 Bagsvaerd T 51 33 10 93 Importer for Estonia Tuleri...

Page 16: ...tallatie installazione instalación instalação instalace installation installatie installazione instalación instalação instalace installation installatie installazione instalación insta lação instalace installation installatie installazione instalación instalação instalace installation installatie installazione instalación instalação instalace installation installatie installazione instala ción ins...

Reviews: