background image

START-UP AND OPERATION  

Merchandiser Start-Up 

 

• 

Plug cord into a certified electrical outlet 
with ground. 

• 

Turn on the main power. Switch is on the 
rear right hand side of base.  Supply power 
will turn on the lights.  First time lighting 
may require a short warm up period for the 
bulbs. Slightly dim or a flickering of new 
bulbs is normal. 

 

Adjustable Shelves 
 

• 

Adjustment of the angle of the shelf can be 
made, not the position. 

• 

Adjustments to the shelves can be made 
by pivoting the lower portion of the shelf 
bracket in the upright. 

 

• 

The shelves can be adjusted to an angle 
of: 0, 5, and 10 degrees.

 

 
Caster locking operation 
 

• 

To lock casters push down on lever to 
unlock pull up the lever all the way. 

 

Raise the Curved Glass  

 

• 

To raise the curved glass, grab the lift han-
dle extrusion on the bottom edge of the 
front curved glass and lift up. 

• 

Gas cylinders hold the glass open for 
hands free access to the interior of the 
case. 

Note: 

When cases are next to a wedge, only 

one front curved glass may be lifted at a time. 

OFF

 

ON

 

Rocker Switch

 

Main Power Switch

 

Lift Handle 

 

 

Summary of Contents for Oasis Mobile Series

Page 1: ...DISER Model MP48 50 1 2 L x 45 1 4 D x 50 3 4 H Includes end panels MULTI PURPOSE SELF SERVICE MERCHANDISER INSTALLATION OPERATING MANUAL M O B I L E S E R I E S I Oper Manuals Oasis MP48_99355 pub 88...

Page 2: ...EMOVAL FROM SKID AND CASE PLACEMENT START UP AND OPERATION MAINTENANCE SERIAL LABEL LOCATION INFORMATION LISTED TECH INFO SERVICE ILLUSTRATED PARTS BREAKDOWN CLEANING SCHEDULE TROUBLESHOOTING WARRANTY...

Page 3: ...ctions to insure proper performance This unit is designed for the display of products in ambient store conditions where temperatures and humidity are maintained at a maximum of 75 F and 55 relative hu...

Page 4: ...case must always remain supported or center of gravity may allow case to fall Remove caster shipping blocks Roll unit to rear of skid and tip backward off skid Slide Skid Out 2 Case Placement Positio...

Page 5: ...nts to the shelves can be made by pivoting the lower portion of the shelf bracket in the upright The shelves can be adjusted to an angle of 0 5 and 10 degrees Caster locking operation To lock casters...

Page 6: ...pliers will be re quired to accomplish this task Light Fixtures Light fixtures can be located on the un derside of each shelf assembly and at the top inside of case See illustration at mid right Remo...

Page 7: ...hich the case conforms For additional technical information and service see the TECHNICAL SERVICE page in this manual for instructions on contacting Structural Concepts Technical Service Department Se...

Page 8: ...8 ILLUSTRATED PARTS BREAKDOWN 1 10 20 5 8 4 14 13 17 15 11 18 19 22 9 2 3 6 7 24 21 16 12 23...

Page 9: ...16 Work Ledge 5 Light Assembly Shelving 17 Door Track Lower 6 Sign Channel 18 Door Sliding 7 Bulb 19 Rear Shelf Support 8 Shelf Bracket Upper 20 Door Track Upper 9 Front Glass Assembly 21 Top Board 1...

Page 10: ...cloth Case Interior Daily Decks Wipe off decks with moist cloth Daily Shelving Clean shelves with a household or com mercial glass cleaner and a soft cloth or paper towel Weekly Rear Doors and Door Tr...

Page 11: ...the bulbs to prevent flickering Check to insure voltage at ballasts If voltage is entering but not exiting ballast ballast is faulty Case Lights Not Working Check that ALL of the light cords are plug...

Page 12: ...ds by Purchaser its employees or customers or any breach of this Agreement by Purchaser Liabilities shall include all costs claims damages judgments and expenses including reasonable attorney fees and...

Page 13: ...13 TECHNICAL SERVICE STRUCTURAL CONCEPTS CORPORATION TECHNICAL SERVICE DEPARTMENT 1 800 433 9489 888 E Porter Road Muskegon MI 49441 Phone 231 798 8888 Fax 231 798 4960 www structuralconcepts com...

Reviews: