MONTERING / MONTERING / HOPSÄTTNING /
KOKOONPANO / ASSEMBLY
res ferdig først.
7) Koble badekaret til avløpet. Fyll bade-
karet, og sjekk om utløp og overløps-
beslag er vanntette. Sjekk om det er
lekkasjer (se fig. E).
8) Tøm ut vannet.
9) Gjør ferdig støtterammen. Husk om
nødvendig tilgangspanelet!
10) Snu badekaret i riktig posisjon på støt-
terammen, og kontroller at føttene er
godt festet. Hvis badekaret skal mon-
teres med et frontpanel, gjøres dette
nå (se fig. F).
11) Fjern alle rester av beskyttelsesfolie fra
badekaret, fyll badekaret, og påfør sili-
kon etter behov. La vannet være i
badekaret i et døgn, slik at silikonet får
tid til å størkne (se fig. G).
1) Before installing, please check your
bathtub has not been damaged
during transport.
2) Spread cardboard or other similar
material on the floor to prevent the
bathtub from being scratched.
3) Fit the set of legs, use the 19 mm
screws. PLEASE NOTE that the 28
mm bottom sheet is covered by fibre
glass (see fig. A). If the bathtub is
reinforced with Carronite™ a Ø2 mm
drill should be used to pre-drill.
Adjust the legs to the desired height
(see fig. A1). If the bathtub is being
installed with front-panel the holding
clamps should be fixed now (see fig.
B). Also fit the holding bars with the
magnetic end plugs. Turn the
bathtub around on its feet.
4) Check what height the bath is to be
installed, bearing in mind the height
of the side panel (if this is to be
installed). This height is stated on
the side panel. Adjust the feet accor-
dingly (see Fig. A).
5) The Celsius Oval can be totally or
partially inbuilt. In both instances the
construction around the bath must
be constructed in accordance with
the required height of the bath.
Ensure that the framework construc-
tion protrudes in under both ends of
the bath approximately 80 mm (see
Fig. B).
6) Carefully lift the bath onto the fra-
mework and adjust the feet so that
they are firmly on the floor. Ensure
that the bath is correctly positioned
and level before tightening the lock-
ing bolts (see Fig. D). Do not secure
the bath at this point as the support
framework has yet to be completed.
7) Connect the bath to the drain. Fill
the bathtub and check if the outlet
and overflow fittings are watertight.
Test for any leaks (see Fig. E).
8) Drain off the water.
9) The support framework should now
be completed. Remember the access
panel if necessary!
10) Return the bath to its correct positi-
on on the support framework and
ensure that the feet are firmly secu-
red. If the bath is to be installed with
a front panel, this should be installed
now (see Fig. F).
11) Remove any remaining protective
film from the bath, fill the bathtub
and apply silicone as required. Leave
the water in the bathtub for 24 hours
to allow the silicone to harden (see
Fig. G).
Fig. D
Fig. F
Monteringsanvisninger
Mounting instructions
UK
Fig. E
S I L I CO
N
S I L I CO
N
24h
Fig. G
CELSIUS OVAL
2.
Summary of Contents for CELSIUS OVAL
Page 5: ......