Strictly Beds & Bunks Wiltshire Bunk Bed Assembly Instructions Manual Download Page 4

Parts Identifier

Consult Box Contents list for QTY

Need Help Assembling This Product?

We have some videos  online that may help you. Please scan 

this barcode using your phone  or visit 

www.strictlybedsandbunks.co.uk/assemblyhelp

SAFETY NOTICE: WOODEN FLOORS

This bed uses support legs to ensure heavy duty use. If you are locating this bed on a 

laminate or wooden floor the bed may move/slip when in use.  You must therefore attach 

non-slip pads under each corner post to prevent this movement. These also protect your 

floor. You can scan this QR Code for details on how to purchase these.

E10

E9

13

13

L

L

R

5

1

1

2

3

20

4

R

Description
LCP - Left Stockton Corner Post

Part 15- 3ft Red Headboard

RCP - Right Stockton Corner Post

Part 1- Long Side rail

E10 - End guard rail - 3ft (RED)

Part 2- Top Long Back Guard Rail 

E09 - End guard rail - 3ft (WHITE)

Part 3- Bottom Long Back Guard Rail 

Part 4- Ladder Steps

Part 6- Front Top  Guard Rail (red)

Part 20- Long Ladder Strut (Stockton)

Part 7 Front Bottom Guard Rail (white)

Part 13- 3ft Blue Headboard

Part 16- Long Centre Rail 

Part 14- 3ft White Headboard

Part 5 - Guard rail Support 

E9

Summary of Contents for Wiltshire Bunk Bed

Page 1: ...er bunk Beds should not be used if any structural part is broken or missing Bunk beds and high beds can present a serious risk of injury from strangulation if not used correctly Never attach or hang i...

Page 2: ...k may appear after the product has been packaged Strictly Beds and Bunks however have a FREE PARTS REQUEST service in this unlikely event You need to order a part please go to Parts Portal www strictl...

Page 3: ...y will not line up GLUE SACHET INCLUDED We have included a sachet of glue THIS IS NOT TO BE USED with the dowel rods Open the sachet and empty into a plastic container Whenever you connect a confirmat...

Page 4: ...ch corner post to prevent this movement These also protect your floor You can scan this QR Code for details on how to purchase these E10 E9 13 13 L L R 5 1 1 2 3 20 4 R Description LCP Left Stockton C...

Page 5: ...dle headboard facias Bolt configuration each end Fixing A Dowel Rod x 2 SIDE RAIL MARKING FIXINGS The part will have a blue marker pen marking on the end Side Rails Bolt configuration each end Fixing...

Page 6: ...d see page 5 FIG 1 for fixings Part 14 White see page 5 FIG 2 for fixings Part 13 Blue see page 5 FIG 3 or 4 for fixings Part 14 White see page 5 FIG 2 for fixings Part 13 Blue see page 5 FIG 3 or 4 f...

Page 7: ...st very important This indicates the top of each post and the row of holes that accepts the side guard rails At this stage we are only fixing two facias the mini facias will be added during the ladder...

Page 8: ...screw one in fully the second will not meet the hole screw both in slowly until tight DO NOT attach the ladder hooks yet We now need to attach the side rails Model shown slightly different bit method...

Page 9: ...These are shown as M on PIC4 Centre the ladder so each of the mini guard rails reach the ladder strut Once in place push down these are designed to be tight Now we need to attach each of the mini gua...

Page 10: ...nside of the bed we need to attach metal brackets one either end These are fixed using the small screws L these are fixed to part 13 blue third insert down from the top Using a tape mark a centre line...

Page 11: ...side rail Now fix the remaining base slats TIP When you have attached the base slats you will have additional base slats screws Out of the 12 slats screw 4 of them directly into the centre rail Using...

Page 12: ...Please note we have not supplied wall fixings due to the many fixing types available Consult your hardware store for the best type Section Added safety Consult Box Contents list for QTY Need Help Asse...

Reviews: