
Circuit Wiring Diagrams
Electrical Circuit and Wiring Information
C-7
shows a three-phase 208V AC, Y-, or
∆
-source circuit connection, which is
a phase-to-neutral source connection. Note that the ftServer X input can be connected
from L1, L2, or L3. This application requires a single-pole circuit breaker.
Figure C-6. Three-Phase 208V AC, Y-, or
∆
-Source Circuit Connection, Phase-to-Neutral
Circuit A or B
X
Y
G (PE)
To power input A or B
Wall
Power Cord
L1
L2
L3
N
G (PE)
120V
120V
208V
208V
120V
0V
Single system: 20A maximum
PDU: 30A maximum
Summary of Contents for ftserver 3300
Page 1: ...Stratus Technologies R553 01 Stratus ftServer 3300 5600 and 6600 Site Planning Guide...
Page 14: ...Preface xiv Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Page 24: ...System Documentation 1 10 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Page 32: ...Planning for Cables 3 4 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Page 50: ...Stratus Supplied Power Cords 4 18 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Page 133: ...Standards Compliance Standards Compliance D 3 VCCI Note BSMI Note...
Page 134: ...Standards Compliance D 4 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Page 138: ...Index Index 4 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...