QUESTIONS? PLEASE CONTACT US
0800 244 266
Page 5
765 Tremaine Avenue, Palmerston North, NZ
Gearbox
Patio Blind
Installation
Leave the blind down for the Clear PVC to settle
out. Any wrinkles from manufacture should
settle out within 24-48 hours.
If the blind has picked up dust or dirt from
installation, refer to the cleaning instructions in
your user guide.
14
Using the tek screws supplied, mount the flush
rings in the marked locations.
Attach the snap hooks to the flush rings, before
back-
tensioning the blind until it is ‘drum
-
tight’.
Back-tensioning means winding the blind up,
while it still attached to the flush rings, until it
is
‘
drum-tight
’
.
13
Using the winder handle provided, wind the
blind down and mark the position of the flush
rings (on the ground directly below the snap
hooks on the bottom bar).
12