background image

www.gardenedging.co.nz

   

Facebook-square INSTAGRAM

A02.V3

Installation guide 

240mm Rigidline

Scan code for installation video 

or follow the link below  

www.straightcurve.info/029

Scan me for 

installation video!

VIEW VIDEO

STEP 1 - JOIN

4B - BRACE

STEP 3 - PEG

STEP 4A - STAKE (OR)

STEP 2 - POSITION

PRE-MADE CORNER*

MAKE CORNER - NOTCH/SCORE WITH GRINDER

PREPARATIONS

Mark line and level or trench as required ready for install.

CORNERS

Pre-made corners* are available for purchase, these include 
the standard joining set. These can be opened or closed 
further with forceful bending to achieve different angle 
corners. You can also choose to make your own. To do this 
score a line down the back of the edge and create a sufficient 
opening (5-7mm) in the folded lip at the top and cut out part 
of the foot at the bottom with your angle grinder to allow 
space for bending. Bend strongly by hand; using a block of 
wood close to the fold to form bend against.

STAKING THE EDGE

Anchor posts are driven in as a stake behind the edge 
adjacent to a bracing rib, which is then screwed onto with 
screws. It is recommended to use two of these per edge.

HARD SURFACE FIXING

If you need to secure the edge to hard surfaces, the universal 
bracing set can be used. To secure to a concrete surface 
remove stake and use bolt down method instead (purchase 
bolts separately).

JOINING SLEEVES 

Shortening a length is sometimes a requirement. The Joining 
sleeve is used to connect the two edges when this occurs. 
These are fixed to the panel front with screws through the 
guide holes in the sleeve.

TIP

The pre-attached bracing ribs can be moved. Knock 
sideways at top to dislodge then pop out from bottom and 
do opposite to re insert them where needed.

Reviews: