![Stove Guard Guardian 2010 Installation & Operating Manual Download Page 2](http://html1.mh-extra.com/html/stove-guard/guardian-2010/guardian-2010_installation-and-operating-manual_1383090002.webp)
Page 2 of 2
WHAT’S INCLUDED (UNPACKING CHECKLIST)
Power Box
EMU (Electronic Monitoring Unit)
Wall mounting screws (2 short) and under cabinet screws (2 long)
Instruction Manual
POWER BOX
EMU
- ELECTRONIC MONITORING UNIT
SG OFF
STOVE OFF
STOVE GUARD
SENSOR
AUTO
TIMER
0 1
TIME
1
7
4
2
12
11
8
3
9
10
13
5
6
14
GUARDIAN
1. Main Power Cord that connects to wall outlet
2. 240VAC 0.7A Fuse
3. Rocker Switch to Control 120V Power
(Must be set during installation)
4. Cord to EMU
5. Mounting Brackets
6. 220-240V Stove Receptacle
1
4
2
3
1
5
4
Side
View
Front
View
6
1. SG OFF button
2. AUTO MODE button to activate Motion
Detector (PIR)
3. STOVE OFF button
4. TIMER MODE button
5. TIME ADJUST button in 10 minute intervals
6. TIME ADJUST button in 1 minute intervals
7. SG OFF Indicator LED
8. MOVEMENT indicator LED for PIR
9. TIMER MODE indicator LED
10. AUTO MODE indicator LED
11. Motion Sensor window for PIR
12. STOVE OFF indicator LED
13. TIME display
14. Sensor height level adjustment screw - to
raise or lower the sensor’s field of view
(Normally does not need to be adjusted).