EQUIPEMNT AND TOOLS FOR INSTALIATION
1.
Measuring tape
2.
String for alignment
3.
Step ladder
4.
Welder
5.
Sledge hammer
6.
Wrench
7.
Scissors
INSTALLATION PROCESS
A
—FRAME INSTALLATION
Figure 1
There are four base plate comes with the back endwall. Each of them should be placed in the
right position(especially the two base plate close to the containers.)