EQUIPEMNT AND TOOLS FOR INSTALIATION
1.
Measuring tape
2.
String for alignment
3.
Step ladder
4.
Welder
5.
Sledge hammer
6.
Wrench
7.
Scissors
INSTALLATION PROCESS
A
—
BASE INSTALLATION
Please refer to the diagram (Figure 1) to place the base plates. UNIT: mm
Figure 1
1.
The measure if from center to center of the tubes. Referring to the above diagram and confirm the
place of the base plates. ENSURE THAT THE FOUNDATIONS IS SQUARE.
2.
All the base plates need to use welder to be welded on the Containers.