background image

 

      

     EQUIPEMNT AND TOOLS FOR INSTALIATION 

1.

 

Measuring tape 

2.

 

String for alignment 

3.

 

Step ladder 

4.

 

Welder 

5.

 

Sledge hammer 

6.

 

Wrench 

7.

 

Scissors 

INSTALLATION PROCESS 

A

BASE INSTALLATION 

Please refer to the diagram (Figure 1) to place the base plates.  UNIT: mm 

 

 

 
 
 
 

 

Figure 1 

1.

 

The measure if from center to center of the tubes. Referring to the above diagram and confirm the 

place of the base plates. ENSURE THAT THE FOUNDATIONS IS SQUARE. 
2.

 

All the base plates need to use welder to be welded on the Containers. 

Reviews: