7
INSTALLATION PROCESS
Note: Make sure to fix the container firmly before installing the shelter.
Framework Installation
1. Weld base plates (No.6 & No.7) to the top of container. Please refer to the diagram (Figure 1) to
mark the position of base plates.
Figure 1