background image

3

YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE SHELTER

.

Thank you for purchasing our shelter. When properly assembled and maintained, this product will provide years
of reliable service. These instructions include helpful hints and important information needed to safely assemble
and properly maintain the shelter. Please read these instructions

before

you begin.

If you have any questions during the assembly, please contact local dealer for assistance.

SAFETY PRECAUTIONS

. Wear eye protection.
. Wear head protection
. Wear gloves when handling metal tubes
. Use a portable GFCI (Ground Fault Circuit Interrupter) when working with power tools and cords.
. Do not climb on the shelter or framing during or after construction.
. Do not occupy the shelter during high winds, tornadoes, or hurricanes.
. Provide adequate ventilation if the structure is enclosed.
. Do not store hazardous materials in the shelter.
. Provide proper ingress and egress to prevent entrapment.

ANCHORING INSTRUCTIONS

Prior to assembling this shelter, please read the

MUST READ

document included with the shipment.

WARNING:

The anchor assembly is an integral part of the shelter construction. Improper anchoring may

cause shelter instability and failure of the structure. Failing to anchor the shelter properly

will void the

manufacturer’s warranty

and may cause serious injury and damage.

LOCATION

Choosing the proper location is an important step before you begin to assemble the structure.
The following suggestions and precautions will help you determine whether your selected location is the best
location.
. Never erect the structure under power lines.
. Identify whether underground cables and pipes are present

before

preparing the site or anchoring the

structure.
. Location should be away from structures that could cause snow to drift on or around the building
. Do not position the shelter where large loads such as snow and ice, large tree branches, or other overhead
obstacles could fall.
. Your shelter’s cover can be quickly removed and stored prior to severe weather conditions. If strong winds or
severe weather is forecast in your area, we recommend removal of cover.

SITE

After choosing a location, proper preparation of the site is essential. The following site characteristics will help
ensure the integrity of the structure.
. The support structure must be level to properly and safely erect and anchor the frame.
. Drainage: Water draining off the structure and from areas surrounding the site should drain away from the site
to prevent damage to the site, the structure, and contents of the structure.

WARNING:

The individuals assembling this structure are responsible for designing and furnishing all

temporary bracing, shoring and support needed during the assembly process. For safety reasons, those who are
not familiar with recognized construction methods and techniques

must seek the help of a qualified contractor.

Summary of Contents for C3340DTR

Page 1: ...1 Shipping Container Roof Double Truss Round Style Model C3340DTR 33 x40 x12 8 arch space Assembly Instructions...

Page 2: ...2 Equipment List Speed Wrench 22 23 24 Hammer 30lb Rope 12 Long Tape 50m Hammer Drill 1 Lifter 2 Crane 1 Forklift 1 Protective equipment...

Page 3: ...and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected...

Page 4: ...steel into the hole making sure 3ft is below the surface completely laying on the side of the containers 3 Weld the square steel to the 2 containers 4 Pour cement in the holes to make sure the square...

Page 5: ...of Single truss framing Customer responsibility 4 It s the owner s responsibility to shovel snow off the canopy rooftop 5 All containers need to be anchored to the ground in each opposite corner sides...

Page 6: ...6 Base Plate four corners with winch 4 7 Base Plate inner with winch 8 8 Lower Tensioning Tube for Roof Cover 4 1 pcs set 2 sets 9 Tube Clip with bolt M10x50 for support tube No 5 24 10 Bolt M8x70 fo...

Page 7: ...7 15 Roof Cover 1 16 Duct Tape 1 17 Expansion Bolt 48...

Page 8: ...er to the diagram Figure 1 to mark the position of base plates Figure 1 1 The measurement is done as the above figure 1 showing Referring to the above diagram and confirm the place of base plates ENSU...

Page 9: ...9 B FRAME INSTALLATION 1 Arch Installation Find Truss Arches No 1 2 3 and Base Plate No 6 7 and connect them by Bolt M8x70 No 10...

Page 10: ...distance between arches Weld the base plate to container firmly 3 Install Purlin No 4 by Carriage Bolt M10x80 No 11 and then the third arch and Purlins In this turn one arch and then purlin tubes 4 In...

Page 11: ...e cover over the frame EVENLY CAREFULLY AND SLOWLY Cut openings on the pocket above the corresponding base plate and loosely secure the Belt No 13 in the Winch being installed on base plates DO NOT TI...

Page 12: ...12 Roof Cover Installation Now your assembly is completed...

Reviews: