![Stone 95CMP Operator'S Manual Download Page 14](http://html1.mh-extra.com/html/stone/95cmp/95cmp_operators-manual_1381972014.webp)
- 14 -
OPERATION
95CMP & 95CMPED
BEFORE STARTING
Mixer are shipped completely assembled and ready for
operation except for installation of the safety chain.
SAFETY CHAIN INSTALLATION
- Remove the
safety chain kit from the engine compartment. The kit
includes (1) 12 ft. length of safety chain and (2)
connecting links. Pull one end of the chain through the
(2) key hole slots located in the front post of the mixer
with a hook (see drawing below and decal on mixer
front post). Attach the connecting links to each end of
the chain. Follow the instructions in the TOWING
section of this manual and on the mixer front post to
attach the safety chain to the towing vehicle.
INSTALLING CHAIN TO MIXER
OIL LEVELS AND LUBRICATION
- Be sure to
check the oil levels in the engine and engine reduction
unit BEFORE starting this unit. The engine warranty is
VOID
if it is run without oil. Consult the ENGINE
MANUAL supplied with this unit for specific
instructions and oil recommendations.
Also check the trunnion bearings to make sure they
have been greased. Consult the Lubrication Section of
the manual for the specific instructions if greasing is
required.
BEFORE WORKING ON MACHINE, MAKE
SURE ENGINE SPARK PLUG WIRE IS
DISCONNECTED, OR, IF ELECTRIC, THAT
THE ELECTRIC CORD IS DISCONNECTED, TO
PREVENT ANY ACCIDENTAL STARTING.
HARDWARE
Check all hardware on mixer and engine / motor before
starting. Consult the TORQUE CHART section of this
manual and tighten any loose hardware accordingly.
FUEL
If your mixer is equipped with a gasoline engine, fill
the gas tank with clean gasoline from a safety can.
Consult the ENGINE MANUAL supplied with this unit
for the proper type of gasoline required.
DO NOT
mix oil with gasoline.
FOLLOW THE GUIDELINES FOUND IN THE
SAFETY PRECAUTION SECTION OF THIS
MANUAL WHENEVER HANDLING GASOLINE.
TO START THE ENGINE/MOTOR
COLD START
- Open the fuel valve under the gas
tank all the way. Open the throttle approximately half
way and apply the choke. Pull the starter rope sharply
about (3) times. When the engine starts, open the
choke and adjust the throttle as necessary to keep it
running. Allow the engine to warm up for a few
minutes before placing it under the load. If the engine
doesn't start after (3) pulls, open choke slightly to
prevent flooding. Always operate the engine at full
throttle when under load.
HOT START
- Open the valve under the gas tank all
the way if it has been shut off. Open the throttle
approximately half way. Do not apply the choke. Pull
the starter rope sharply until the engine starts. When
WARNING
WARNING
Summary of Contents for 95CMP
Page 2: ......