- 16 -
Operation
After discharge of concrete, immediately pour in the
required amount of water for the next batch.
NOTE:
When servicing brake mechanism, bolt A
should be tightened so that approximately 17 - 18
pounds of force is required to release the brake. This
will prevent accidental discharge due to vibration.
CAPACITIES
* Maximum batch size depends on mix and type of
aggregate used.
SAMPLE MIX
Volume relationship of 1:2-1/4:3
(cement : sand : gravel) mix. The mix volume may
vary depending on aggregate used.
65CM
75CM
95CM
105CM
Total Drum
9.0 cu. ft.
9.5 cu. ft.
15.1 cu. ft. 15.6 cu. ft.
Volume
Max Batch
6.0 cu. ft.
7.0 cu. ft.
9.0 cu. ft.
10.0 cu. ft.
Size*
Mix Volume
Cu. Ft.
3
4
6
9
10
Cement
(bags)
1/2
2/3
1
1-1/2
1-3/4
Water (gal.)
2-1/2
3-1/2 5-1/4
8
9-1/4
Sand (gal./
shovels)
9
12
18
27
30
Gravel (gal./
shovels)
12
16
23
36
40
WARNING
CLEANING
For consistent performance, long life and continued
high quality mixing of cement, thoroughly clean the
mixer inside and out at the end of each day's operation.
Drum may be scoured by 2 minute operation with
gravel and water mixture. Discharge, then hose down
drum inside and outside. Keep mixer clean.
Before cleaning, shut off the engine or motor and
disconnect the spark plug wire or electric cord to
prevent accidental starting. Spray the mixer with
water before the mix dries to remove any
accumulations. Dried mix should be scraped out as
necessary. DO NOT beat on drum with shovel,
hammer or other device to break up accumulations of
dried mix, as this will dent and damage the drum.
NEVER POUR OR SPRAY WATER ON THE
ENGINE OR MOTOR.
NEVER PUT HANDS OR ANY OBJECT INTO
THE DRUM WHILE THE ENGINE OR MOTOR
IS RUNNING.
ALWAYS DISCONNECT THE SPARK PLUG
WIRE OR ELECTRIC CORD WHEN CLEANING
INSIDE DRUM.
Capacities/Sample Mix/Cleaning