background image

©  stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

State: 15.06.2016 · S. 3

Mounting instructions for digger „tollo“ 

Item-No. 51 1100 402

6.  After the setting clean the surface of the foundation, place the pre-mounted 

play equipment onto it and screw the base plate onto the foundation anchor 
with the included heavy-duty dowel M10.

7.  Seal the foundation with the safety cover required for the height of fall indi-

cated (critical drop height ≤ 1000 mm). Set up impact-absorbing playground 
surfacing according to EN 1176-1, table 4.  
Recommended surface material: sand

8.  Do not allow to use the equipment before the installation has been finished.  

9.  Attention:

 If the play equipment has been incompletely installed or partly 

dismantled when carrying out maintenance and repair work, this may lead to 
particular risks of injury for the user. For this reason, make clearly visible that 
the equipment shall not be used in such cases. 

10. NOTE:

 Play equipment, which contain components made of stainless steel 

should not come with „normal“ steel parts in contact. Those steel parts may 
rub off and leave small steel particles in combination with moisture brown rust 
stains.If such corrosion occur on stainless steel parts, they are fine with an 
abrasive (240 grit) to remove.  
Please take care when transporting and setting up the fact that the compo-
nents are made of stainless steel with no „normal“ steel parts in contact. 

Diagram 3: Top view „tollo“

Extent of the 

minimum zone 

= safety area

5420

2420

Rev.:

Projekt:

BESTELL-NR:

ZG-NR:

BENENNUNG:

OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT 

NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET 

WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

FREIG:

GEPR:

GEZ:

DATUM:

NAME:

WERKSTOFF



MAßSTAB:

OBERFLAECHEN NACH

DIN ISO 1302 REIHE 2

ZUL. ABWEICHUNG

DIN 2768 - mH

+0,3

-0,3

WERKSTUECKKANTEN

NACH DIN 6784

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

A3

29.02.2016

Abmaße:

Fertigung:

Behnke

x

Gewicht:

Draufsicht

0050A-00-00

tollo neu

Summary of Contents for tollo

Page 1: ...t Larsheck 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved State 15 06 2016 S 1 Mounting instructions for digger tollo Item No 51 1100 402 Diagram 1 Overall vi...

Page 2: ...ete cover h 3 cm Concrete quality class B25 450 400 350 Sand Sand Beton Concrete F llmaterial Filling Erde Gound Rev Projekt Sandbagger tollo neu BESTELL NR ZG NR BENENNUNG OHNE SCHRIFTLICHE ZUSTIMMUN...

Page 3: ...ed in such cases 10 NOTE Play equipment which contain components made of stainless steel should not come with normal steel parts in contact Those steel parts may rub off and leave small steel particle...

Page 4: ...d cleaner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive components only wipe over stainless steel surface in polishing directi...

Page 5: ...the equipment which may be affected due to corrosion or vandalism and its operational safety especially after repair works or after mounting new elements or replacing existing elements For that purpo...

Page 6: ...quid cleaner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive components only wipe over stainless steel surface in polishing dire...

Page 7: ...t vulcanized caout chouc 1 piece handles stainless steel V2A tube end caps balls made of soft vulca nized caoutchouc 2 pieces digger levers stainless steel V2A 2 pieces shovel stainless steel V2A 1 pi...

Reviews: