1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 3). 

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for the foundation as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note: 

The seesaw is installed at play level.  

Pay attention to items marked „play level“ at play equipment! 

4.  Set up the concrete foundation according to diagram 2 with central, horizontal 

reinforcement.

5.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation.

Reinforcement plan: 

Concrete foundation with rein-

forcement
Main foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C 20/25

Diagram 2: Foundation plan

500

1500

454

1150

 450 

 231 

A

A

1500

1250

120,5

250

A-A

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

navis

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:20

A3

Name

Name

Fundament

0412-00-00

Maßstab

Schramm

01.12.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
ES

14.05.20

stoßdämpfender Boden

Datum

Änderung

Rev

Play level

Foundation

Summary of Contents for navis

Page 1: ...rsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved Mounting instructions for the seesaw ship navis Item No 51 2517 401 State 03 06 2020 S 1 Diagram 1 Overall view of the play equipment ...

Page 2: ...ontal reinforcement 5 After a setting period of 10 14 days depending on weather conditions and foundation size fill up and compress the holes between the foundation and the foundation hole with excavation Reinforcement plan Concrete foundation with rein forcement Main foundation BSt 500S Stirrups Ø 8 mm lengthwise and cross Concrete cover h 3 cm Concrete quality class C 20 25 Diagram 2 Foundation ...

Page 3: ...ble that the equipment shall not be used in such cases NOTE Play equipment which contain components made of stainless steel should not come with normal steel parts in contact Of these steel parts may rub off and leave small steel particles in combination with moisture brown rust stains If such corrosion occur on stainless steel parts they are fine with an abrasive 240 grit to remove Please take ca...

Page 4: ...liquid cleaner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive components only wipe over stainless steel surface in polishing direction For heavily soiled surfaces polishes can be used e g for cleaning chrome on cars or for greasy and oily dirt alcoholic cleaning agents and solvents e g ethyl alcohol isopropyl alcohol or aceto...

Reviews: