background image

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

State: 26.08.2021 p. 4

Mounting instructions for multiplay „gravis 2A“

Item-No. 51 5519 421

6.  Clean the foundation surface. Connect the platform to the posts acc. to 

diagram 1 and 4. Please fasten the parts using the screws including in 
the delivery.                         

7.  Place the both towers as shown in diagram 1 and 3 on the foundation 

and do a rough aligning. The connection of the wobble bridge and the 
connection of the layaway bow should be face to face.  

Note: Do not screw the base plates onto the foundations yet!

     

8.  Place the climbing wall as shown in diagram 1 and 2 in the middle bet-

ween the two towers.  

Attention: Safe the climbing wall during the whole construction of 

the multiplay equipment against overturning.

9.  Connect the layaway bow with the tower and the climbing wall at the 

intended locations acc. to the diagram 1, 5c and 6a using the screws 
including in the delivery.

10. Mount the wobble bridge with the tower and the climbing wall at the inten-

ded locations acc. to the diagram 1, 5d and 6c. Please fasten the parts 
using the shackles including in the delivery.

11.  Connect the slide with the tower at the intended locations acc. to the 

diagram 1 and 5b. Please fasten the parts using the screws including in 
the delivery (see diagram 6b).

12. Connect the climbing balls (diagram 5e) and the parallel bars slide (dia-

gram 5f) with the tower at the intended locations acc. to diagram 1 in the 
same way as the layaway bow (shown in diagram 6a). Please fasten the 
parts using the screws including in the delivery.

13. Place the base plate of the climbing net onto the foundation and connect 

the climbing net (diagram 5a) with the tower at the intended locations 
acc. to the diagram 1 and 6c. Please fasten the parts using the shackles  
included in the delivery.

Diagram 4: Platform

connection post / tower

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

Oberflächen nach

DIN ISO 1302

Reihe 2

Zul. Abweichung

DIN 2768 - mH

1

 

gravis

Benennung

Gepr.

Werkstoff

Blatt

Datum

Projekt

Gez.

Zuschnitt

Zeichnungsnummer

Rev

Änderung

Datum

1:20

A3

Gewicht

Name

Name

Kugelaufstieg 

1001-13-00

27.91

Maßstab

Schramm

02.11.18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Summary of Contents for multiplay gravis 2A

Page 1: ...All rights and product modifications reserved State 26 08 2021 p 1 Mounting instructions for multiplay gravis 2A Item No 51 5519 421 parallel bars slide tower climbing net climbing balls post layaway bow slide wobble bridge climbing wall Diagram 1 Overall view of the play equipment ...

Page 2: ...a setting period of 10 14 days depending on weather conditions and foundation size fill up and compress the holes between the foundation and the foundation hole with excavation Diagram 2 Top view Reinforcement plan Concrete foundation with reinforcement Foundation BSt 500S Stirrups Ø 8 mm lengthwise and cross Concrete cover h 3 cm Concrete quality class C 25 30 R1500 R 1 5 0 0 1500 2 0 0 0 R 1 0 0...

Page 3: ...onis 12 11 18 Gewerbegebiet Larsheck 56271 Kleinmaischeid Deutschland Beton concrete gewachsenes Erdreich natural ground Legende stoßdämpfender Boden shock absorbing floor B stoßdämpfender Boden 21 08 20 ES SI 18 07 19 retis Fundament näher A Datum Änderung Rev A A 4920 800 6 0 0 600 600 282 2223 2104 800 6 0 0 9988 4957 1992 6 0 0 1649 479 1338 1268 670 992 496 1034 2685 635 635 740 1559 2276 279...

Page 4: ...ow with the tower and the climbing wall at the intended locations acc to the diagram 1 5c and 6a using the screws including in the delivery 10 Mount the wobble bridge with the tower and the climbing wall at the inten ded locations acc to the diagram 1 5d and 6c Please fasten the parts using the shackles including in the delivery 11 Connect the slide with the tower at the intended locations acc to ...

Page 5: ...MACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET WERDEN ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT FREIG GEPR GEZ DATUM NAME WERKSTOFF MAßSTAB OBERFLAECHEN NACH DIN ISO 1302 REIHE 2 ZUL ABWEICHUNG DIN 2768 mH 0 3 0 3 WERKSTUECKKANTEN NACH DIN 6784 Gewerbegebiet Larsheck 56271 Kleinmaischeid Deutschland xxxx xx xx 18 05 2016 Abmaße Fertigung x x Gewicht 193650 2 x Diagram 5a A...

Page 6: ...oduct modifications reserved State 26 08 2021 p 6 Mounting instructions for multiplay gravis 2A Item No 51 5519 421 Diagram 6c Attachment parts climbing net wobble bridge flap Diagram 6a Attachment parts layaway bow climbing balls and parallel bars slide tube adapter Diagram 6b Attachment part slide ...

Page 7: ...ve with an abrasive 240 grit Please take care when transporting and setting up the fact that the components are made of stainless steel with no normal steel parts in contact In order to preserve a good visual appearance of your stilum playground equip ment over a long period one should take care of maintenance of the stainless surface even despite of their corrosion resistance Especially areas whi...

Reviews: