background image

©  stilum GmbH, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  Alle Rechte und Produktmodifikationen vorbehalten

Stand: 12.05.2017 S. 3

Mounting instructions for multiplay equipment „gravis 1A“

Item-No. 51 5519 401

foundation

1.  Select the play equipment location in consideration of the required safety 

area (see Diagram 4: 6314mm x 6960mm).

2.  Carry out excavation work for foundation as shown in Diagram 2a and 3a. 

After excavation, compress the foundation floor.

 

Note: 

Cover the foundation holes with the safety cover required for the height 

of fall indicated.The combination equipment is built in on the play level. Pay 
attention to items marked „game level” of play equipment!

3.  Set up the 5 main concrete foundations (LxWxH 600 x 600 x 400 mm) and 

the slide foundation (LxWxH 1700 x 700 x 400 mm) acc. to the dimensions 
indicated in diagram 2a in the quality class C 20/25. 

4.  After a setting period of 10-14 days, depending on weather conditions and 

foundation size - clean the surface of the foundations and start with the instal-
lation of the combination equipment. 

5.  Connect the tower at the intended locations acc. to the Diagram 1,3a and 5. 

Please  fasten  the  parts  using  the  screws  including  in  the  delivery.                                             

Reinforcement plan:

Concrete foundation with reinforcement
Main foundation: BSt 500S 
Ever 4 stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C 20/25
Foundations for attachment parts are no-reinforced

Anbindung Turm

Rev.:

Projekt:

BESTELL-NR:

ZG-NR:

BENENNUNG:

OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT 

NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET 

WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

FREIG:

GEPR:

GEZ:

DATUM:

NAME:

WERKSTOFF



MAßSTAB:

OBERFLAECHEN NACH

DIN ISO 1302 REIHE 2

ZUL. ABWEICHUNG

DIN 2768 - mH

+0,3

-0,3

WERKSTUECKKANTEN

NACH DIN 6784

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

A3

0133-01-00

29.04.2015

Abmaße:

Fertigung:

x

x

Gewicht:

35723.4

Gravis2

Diagram 3b: Frame

Summary of Contents for gravis 1A

Page 1: ...echte und Produktmodifikationen vorbehalten Stand 12 05 2017 S 1 Mounting instructions for multiplay equipment gravis 1A Item No 51 5519 401 Diagram 1 Overall view of play equipment with description of individual elements tower bow climbing net climbing bow frame ...

Page 2: ...12 2014 M Boehm Baumarkt Klettergerät 0133 00 00 Baumarkt Klettergerät1 0133 00 00 Fertigung E 1x 400 600 450 1458 3313 3936 Spielebene Play level Erde Ground Beton Concrete Freie Fallhöhe 1500mm D E F C 1 2 3 4 B A 3 2 1 5 C D 4 6 7 8 A B Zust Änderung Datum Datum Name Name Bearb Gepr Norm A3 Bl Allgemein toleranzen DIN 7168 m Maßstab 1 1 03 12 2014 M Boehm Baumarkt Klettergerät 0133 00 00 Baumar...

Page 3: ...itions and foundation size clean the surface of the foundations and start with the instal lation of the combination equipment 5 Connect the tower at the intended locations acc to the Diagram 1 3a and 5 Please fasten the parts using the screws including in the delivery Reinforcement plan Concrete foundation with reinforcement Main foundation BSt 500S Ever 4 stirrups Ø 8 mm lengthwise and cross Conc...

Page 4: ...S 4 Mounting instructions for multiplay equipment gravis 1A Item No 51 5519 401 Diagram 4 safety zone 6960 6314 1716 1556 Oberflächen nach DIN ISO 1302 Reihe 2 Zul Abweichung DIN 2768 mH gravis 1A Benennung Gepr Werkstoff B Datum Projekt Gez Zuschnitt Zeichnungsnummer Gewicht Name Draufsicht 273312 4 Maßstab Behnke 12 05 17 ...

Page 5: ...ng Kletterbogen Anbindung Gestell Rev Projekt BESTELL NR ZG NR BENENNUNG OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET WERDEN ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT FREIG GEPR GEZ DATUM NAME WERKSTOFF MAßSTAB OBERFLAECHEN N...

Page 6: ... DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET WERDEN ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT FREIG GEPR GEZ DATUM NAME WERKSTOFF MAßSTAB OBERFLAECHEN NACH DIN ISO 1302 REIHE 2 ZUL ABWEICHUNG DIN 2768 mH 0 3 0 3 WERKSTUECKKANTEN NACH DIN 6784 Gewerbegebiet Larsheck 56271 Klein...

Page 7: ...13 After 3 months check the screws at the joints and retighten them if necessary 14 Do not allow children to use the equipment before the installation has been finished Attention If the play equipment has been incompletely installed or partly dis mantled when carrying out maintenance and repair work this may lead to particular risks of injury for the user For this reason make clearly visible that ...

Page 8: ...or persistent deposits use a clean cloth moistened with a special liquid cleaner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive components only wipe over stainless steel surface in polishing direction For heavily soiled surfaces polishes can be used e g for cleaning chrome on cars or for greasy and oily dirt alcoholic cleanin...

Reviews: