Mounting instructions for climbing equipment „astrum 1“ 

Item-No.  51 5620 401

State: 30.08.2017 p. 1

 

©  stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

big climbing net

tower

Diagram 1: Overall view of the play equipment 

clamping system

Summary of Contents for astrum 1

Page 1: ...m 1 Item No 51 5620 401 State 30 08 2017 p 1 stilum GmbH Gewerbegebiet Larsheck 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved big climbing net tower Diagram 1 Overall view of the play equipment clamping system ...

Page 2: ...consideration of the required safety area see diagram 3 Ø12000mm 2 Carry out excavation work for 5 foundations as shown in Diagram 2a and 2b After excavation compress the foundation floor Note The climbing equipment is only available in the installation depth of 450 The combination equipment is built in on the play level Pay attention to items marked game level of play equipment 3 Setup the 12 fou...

Page 3: ... the delivery Note Take care that the tower is rectified horizontally onto the founda tion A subsequent alignment with the ropes is not possible and stronly advised against doing it 7 Hook the big climbing net at the intended locations at the tower and net 8 Pull the suspended climbing net starlike externally considering the exact orientation of the ropes Note The net connectors should be parallel...

Page 4: ... of the ropes but still make sure that the tower is still upright 13 Mount all the other clamping systems and span them 14 Fill up and compress the holes between the foundation and the foundation hole with the excavation 15 Seal the foundation with the safety cover required for the height of fall indicated Critical drop height 800 mm Recommended surface material grass sand wood chip gravel synth f...

Page 5: ... maintenance of the stainless surface even despite of their corrosion resistance Especially areas which can not be reached by rainfall should be frequently clea ned from dirt and deposits due to air pollution and dirt caused by the atmosphere Light soiling can easily be romoved by using a high pressure cleaner For persistent deposits use a clean cloth moistened with a special liquid cleaner e g on...